Skip to main content

Bridge replacement funding approved

The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009. Local Transport Minister Norman Baker said that the Department for Transport will provide £11.17 million (e13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria. The council’s Cabinet last month approved Birse Civils, part of the Balfour Beatty Group, as the preferred contractor to build the new bridge.
May 10, 2012 Read time: 2 mins
An artist's impression of how the new Northside Road Bridge may look
The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009.

Local Transport Minister Norman Baker said that the 5432 Department for Transport will provide £11.17 million (€13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria.

The council’s Cabinet last month approved 1486 Birse Civils, part of the 1146 Balfour Beatty Group, as the preferred contractor to build the new bridge.

The construction programme is scheduled to take 45 weeks and the new bridge will span 152m over the river.

The new steel bridge beams will be positioned into place around five months into the project with the three-span structure supported on concrete piers and clad in sandstone, similar to that used on the original bridge (where possible reclaimed stone from the original structure will be used). It will carry vehicles, pedestrians and cyclists on a similar alignment to the previous bridge.

Associated works include service diversions, retaining walls and roadworks to connect the new bridge to Workington's existing road network.

The new bridge has already secured planning permission and the design has been shaped and supported by local people.

For more information on companies in this article

Related Content

  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Tasmanian bridge proposal faces controversy
    October 27, 2020
    The design proposal for a new Tasmanian bridge project faces controversy.
  • Peri cantilever for Terfener Bridge
    May 17, 2021
    The Terfener Innbrücke reconstruction in the Inntal valley started in 2018 and is currently one of largest bridge construction projects in western Austria. In addition to providing planning services and onsite support, Peri has used its VBC Balanced Cantilever Carriage for the first time in Central Europe.
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl