Skip to main content

Bridge replacement funding approved

The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009. Local Transport Minister Norman Baker said that the Department for Transport will provide £11.17 million (e13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria. The council’s Cabinet last month approved Birse Civils, part of the Balfour Beatty Group, as the preferred contractor to build the new bridge.
May 10, 2012 Read time: 2 mins
An artist's impression of how the new Northside Road Bridge may look
The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009.

Local Transport Minister Norman Baker said that the 5432 Department for Transport will provide £11.17 million (€13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria.

The council’s Cabinet last month approved 1486 Birse Civils, part of the 1146 Balfour Beatty Group, as the preferred contractor to build the new bridge.

The construction programme is scheduled to take 45 weeks and the new bridge will span 152m over the river.

The new steel bridge beams will be positioned into place around five months into the project with the three-span structure supported on concrete piers and clad in sandstone, similar to that used on the original bridge (where possible reclaimed stone from the original structure will be used). It will carry vehicles, pedestrians and cyclists on a similar alignment to the previous bridge.

Associated works include service diversions, retaining walls and roadworks to connect the new bridge to Workington's existing road network.

The new bridge has already secured planning permission and the design has been shaped and supported by local people.

For more information on companies in this article

Related Content

  • Towards sustainable mobility
    April 12, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility.From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes. Space on roads throughout the modern world is decreasing as the volume of cars and road users increases. How can mobility be safeguarded without compromising quality of life or environmental well-being? As engineers, we have a responsib
  • Towards sustainable mobility
    February 20, 2012
    Tony Marshall, Director at Arup, looks at ways in which the company encourages sustainable mobility. From policy and systems development through to the design and execution of major infrastructure projects, he reviews Arup's global project experiences and research programmes
  • Cleveland to rebuild Newport Transporter
    March 16, 2021
    Cleveland Bridge will renovate the 197m-long bridge that opened in 1906.
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor