Skip to main content

Bridge replacement funding approved

The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009. Local Transport Minister Norman Baker said that the Department for Transport will provide £11.17 million (e13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria. The council’s Cabinet last month approved Birse Civils, part of the Balfour Beatty Group, as the preferred contractor to build the new bridge.
May 10, 2012 Read time: 2 mins
An artist's impression of how the new Northside Road Bridge may look
The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009.

Local Transport Minister Norman Baker said that the 5432 Department for Transport will provide £11.17 million (€13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria.

The council’s Cabinet last month approved 1486 Birse Civils, part of the 1146 Balfour Beatty Group, as the preferred contractor to build the new bridge.

The construction programme is scheduled to take 45 weeks and the new bridge will span 152m over the river.

The new steel bridge beams will be positioned into place around five months into the project with the three-span structure supported on concrete piers and clad in sandstone, similar to that used on the original bridge (where possible reclaimed stone from the original structure will be used). It will carry vehicles, pedestrians and cyclists on a similar alignment to the previous bridge.

Associated works include service diversions, retaining walls and roadworks to connect the new bridge to Workington's existing road network.

The new bridge has already secured planning permission and the design has been shaped and supported by local people.

For more information on companies in this article

Related Content

  • Tekla models its BIM software
    January 30, 2015
    More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software. BIM is increasingly the must-have ability for a supply chain and Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.
  • Tekla models its BIM software
    January 6, 2017
    More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software. BIM is increasingly the must-have ability for a supply chain and Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • Peri cantilever for Terfener Bridge
    February 26, 2021
    Peri used its VBC Balanced Cantilever Carriage for the first time in Central Europe.