Skip to main content

Bridge replacement funding approved

The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009. Local Transport Minister Norman Baker said that the Department for Transport will provide £11.17 million (e13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria. The council’s Cabinet last month approved Birse Civils, part of the Balfour Beatty Group, as the preferred contractor to build the new bridge.
May 10, 2012 Read time: 2 mins
An artist's impression of how the new Northside Road Bridge may look
The UK government has confirmed the funding to build a replacement for Northside Road Bridge in Workington, which was destroyed in the floods of November, 2009.

Local Transport Minister Norman Baker said that the 5432 Department for Transport will provide £11.17 million (€13.25 million) towards the new permanent crossing of the River Derwent in County Cumbria.

The council’s Cabinet last month approved 1486 Birse Civils, part of the 1146 Balfour Beatty Group, as the preferred contractor to build the new bridge.

The construction programme is scheduled to take 45 weeks and the new bridge will span 152m over the river.

The new steel bridge beams will be positioned into place around five months into the project with the three-span structure supported on concrete piers and clad in sandstone, similar to that used on the original bridge (where possible reclaimed stone from the original structure will be used). It will carry vehicles, pedestrians and cyclists on a similar alignment to the previous bridge.

Associated works include service diversions, retaining walls and roadworks to connect the new bridge to Workington's existing road network.

The new bridge has already secured planning permission and the design has been shaped and supported by local people.

For more information on companies in this article

Related Content

  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Tenders soon to replace Beaumont Bridge
    May 4, 2021
    The Waka Kotahi, NZ Transport Agency, said construction over the Clutha River is expected to take two years and cost around US$14.5 million.
  • UK government calls satnav summit to tackle mapping problems
    March 1, 2012
    UK local transport minister, Norman Baker has announced he will host the governments first 'satnav summit' early in March to thrash out solutions to end the misery caused when lorry and car drivers follow out of date directions from their satnavs.
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.