Skip to main content

Bridge replacement assembled overnight

Highways service provider Balfour Beatty Mott MacDonald has completed a major milestone in a project to replace a bridge for use by the local community over the M5 motorway near the city of Bristol, south-west England.
February 21, 2012 Read time: 1 min
The new bridge is lifted into position over the M5 Motorway
Highways service provider 1530 Balfour Beatty Mott MacDonald has completed a major milestone in a project to replace a bridge for use by the local community over the M5 motorway near the city of Bristol, south-west England.
The operation was carried out overnight to minimise disruption to the travelling public.
Working on behalf of the 1441 UK Highways Agency, Balfour Beatty Mott MacDonald carried out the £1.6 million (€e1.9 million) project to replace the bridge at Lawrence Weston after the previous concrete structure had become weakened from vehicle strikes over many years.
The replacement structure is a low maintenance, single span steel bridge suitable for pedestrians and cyclists, forming a crucial link in a south-west cycle route and providing access for non-motorised users from the city to reach the countryside.
Weighing 92 tonnes and with a span of 66m, the new structure was manufactured in three sections before being transported to site where it was assembled and lifted into place during the overnight closure of the motorway.

For more information on companies in this article

Related Content

  • Improving safety for cyclists
    November 15, 2013
    New systems in development for protecting vulnerable road users - Mike Woof writes In many European countries the number of people using bicycles for commuting are increasing. This is being actively encouraged by city authorities as it offers an effective way to reduce traffic congestion, lower exhaust emissions and also improve public health. The Netherlands and Denmark have long had high percentages of commuters opting to use bicycles and other European countries are looking to capitalise on the experienc
  • Tenders soon to replace Beaumont Bridge
    May 4, 2021
    The Waka Kotahi, NZ Transport Agency, said construction over the Clutha River is expected to take two years and cost around US$14.5 million.
  • Successful overnight bridge demolition
    March 10, 2014
    In the UK a contractor carried out a successful overnight demolition of a highway bridge. Demolition firm S Evans and Sons carried out the work, as a sub-contract to main contractor Balfour Beatty. The work involved removing the pedestrian bridge located close to the town of Stafford. The bridge spanned the busy M54 motorway and the work was carried out at night to minimise disturbance to the traffic flow.
  • Riga's newest bridge improved traffic flow
    April 11, 2012
    An alliance of companies has come together to realise major infrastructure projects in Latvia including its biggest bridge. Patrick Smith reports. Riga, the Latvian capital, has the finest collection of Art Nouveau buildings in Europe and its centre is on the UNESCO World Heritage List.