Skip to main content

Bridge replacement assembled overnight

Highways service provider Balfour Beatty Mott MacDonald has completed a major milestone in a project to replace a bridge for use by the local community over the M5 motorway near the city of Bristol, south-west England.
February 21, 2012 Read time: 1 min
The new bridge is lifted into position over the M5 Motorway
Highways service provider 1530 Balfour Beatty Mott MacDonald has completed a major milestone in a project to replace a bridge for use by the local community over the M5 motorway near the city of Bristol, south-west England.
The operation was carried out overnight to minimise disruption to the travelling public.
Working on behalf of the 1441 UK Highways Agency, Balfour Beatty Mott MacDonald carried out the £1.6 million (€e1.9 million) project to replace the bridge at Lawrence Weston after the previous concrete structure had become weakened from vehicle strikes over many years.
The replacement structure is a low maintenance, single span steel bridge suitable for pedestrians and cyclists, forming a crucial link in a south-west cycle route and providing access for non-motorised users from the city to reach the countryside.
Weighing 92 tonnes and with a span of 66m, the new structure was manufactured in three sections before being transported to site where it was assembled and lifted into place during the overnight closure of the motorway.

For more information on companies in this article

Related Content

  • The Preston Western Distributor
    September 7, 2023
    Costain, as main contractor for the Preston Western Distributor project, was involved from the earliest stages, thanks to the UK’s Early Contractor Involvement approach. The project was delivered on time and on budget to the benefit of the local environment, local businesses and the region’s workforce. David Arminas reports*
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • US$600 million for Cape Fear bridge replacement?
    February 14, 2024
    An estimate of up to US$600 million has been suggested for North Carolina’s Cape Fear bridge replacement.