Skip to main content

Bridge repairs for Nepal

Repair work is underway in Nepal on a key bridge located on the Ratna Highway. The 117m bridge over the Bheri River links Surkhet and Dailekh was built in 1988 by a Chinese construction company and now required urgent repair. Work being carried out includes the removal of corrosion from truss sections using sand blasting and repainting to provide long term protection. Another major part of the repair involves raising the Eastern end of the bridge, which has damaged bolts and subsided due to overweight vehic
April 30, 2012 Read time: 2 mins
Repair work is underway in Nepal on a key bridge located on the Ratna Highway. The 117m bridge over the Bheri River links Surkhet and Dailekh was built in 1988 by a Chinese construction company and now required urgent repair. Work being carried out includes the removal of corrosion from truss sections using sand blasting and repainting to provide long term protection. Another major part of the repair involves raising the Eastern end of the bridge, which has damaged bolts and subsided due to overweight vehicles. Other major tasks underway include sealing the deck using a specially selected material. The repair work is due for completion by March 2012 and is being funded directly by the Nepalese Government as part of a programme to upgrade many of the country’s older bridges. As part of the same programme, repairs are also being carried out to the Mungling suspension bridge. This structure spans the Trishuli River on the Prithvi Highway linking Munging and Chitwan and the work is being carried out during the night to prevent daytime traffic delays. The work involves replacing worn bridge bearings.

Related Content

  • New bridge connection from Nigeria to Cameroon
    August 18, 2015
    A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries.
  • Final beam for Gerald Desmond Bridge replacement
    May 1, 2020
    The US$1.47 billion project was started in 2013 and open later this year.
  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Long-lasting surface repairs for Avonmouth Bridge
    July 9, 2012
    Two technologies combined to give a heavily used bridge a new surface that should last for years The Avonmouth Bridge carries the M5 motorway over the River Avon, and is a vital part of the road infrastructure in south-west England, linking the counties of Somerset, Devon and Cornwall to the rest of the country. Completed in 1973, it carries commuters to the city of Bristol, and to South Wales, along with holidaymakers. The 1.4km long steel box girder bridge comprising a 16,000m2 steel decked central span a