Skip to main content

Bridge repairs for Nepal

Repair work is underway in Nepal on a key bridge located on the Ratna Highway. The 117m bridge over the Bheri River links Surkhet and Dailekh was built in 1988 by a Chinese construction company and now required urgent repair. Work being carried out includes the removal of corrosion from truss sections using sand blasting and repainting to provide long term protection. Another major part of the repair involves raising the Eastern end of the bridge, which has damaged bolts and subsided due to overweight vehic
April 30, 2012 Read time: 2 mins
Repair work is underway in Nepal on a key bridge located on the Ratna Highway. The 117m bridge over the Bheri River links Surkhet and Dailekh was built in 1988 by a Chinese construction company and now required urgent repair. Work being carried out includes the removal of corrosion from truss sections using sand blasting and repainting to provide long term protection. Another major part of the repair involves raising the Eastern end of the bridge, which has damaged bolts and subsided due to overweight vehicles. Other major tasks underway include sealing the deck using a specially selected material. The repair work is due for completion by March 2012 and is being funded directly by the Nepalese Government as part of a programme to upgrade many of the country’s older bridges. As part of the same programme, repairs are also being carried out to the Mungling suspension bridge. This structure spans the Trishuli River on the Prithvi Highway linking Munging and Chitwan and the work is being carried out during the night to prevent daytime traffic delays. The work involves replacing worn bridge bearings.

Related Content

  • Vital structures
    February 10, 2012
    A wide variety of products are available to help bridge owners reduce the need for costly repairs. Bridges are one of the most expensive structures on a highway system, and their maintenance, and where necessary, repair will save millions over time. Prevention being better than cure means that anything that can be done to reduce the need for repair is a good investment. For example, a MOOG bucket-type inspection unit has been commissioned for the Naini Bridge in Allahabad in the state of Uttar Pradesh, Indi
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes