Skip to main content

Bridge monitoring plan

The Nepalese Government is setting out plans for the quality and standards of construction and maintenance of roads and bridges.
February 27, 2012 Read time: 1 min
The Nepalese Government is setting out plans for the quality and standards of construction and maintenance of roads and bridges. The plans include technical tests, monitoring and evaluation and the aim of this is to tackle early failures of infrastructure in the country. Bridges in particular have been suffering from structural issues and the aim is to eliminate such problems by monitoring condition more effectively. If bridges or other infrastructure is found to be defective early in its design life, arrangements will be made to claim compensation from the contractor.

Related Content

  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled
  • Transport maintenance event for Istanbul, Turkey
    January 22, 2018
    A new transport maintenance workshop is planned for Istanbul, Turkey in May 2018. The second SENsing SKIN (SENSKIN) workshop for Monitoring-Based Maintenance of the Transport Infrastructure will be held from 24th - 25th May 2018. The First SENSKIN Workshop was held on 8th November 2017 in Brussels.
  • Safe road barrier innovations
    March 8, 2012
    New road barrier concepts offer major gains in highway safety.
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.