Skip to main content

Bridge link underway in Texas

In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls. The Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges.
March 22, 2012 Read time: 2 mins
New twin bridges at Marle Falls in Texas will carrying US 281 over the Colorado River - image courtesy of Guy Tuttle
In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls.

The 3499 Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges. This crossing is some 80km from Austin and the project requires the demolition of the existing steel truss bridge and the construction of twin segmental bridges. The new bridges will be built using the balanced cantilever construction method with end spans constructed on falsework.

Finley Engineering Group (FINLEY) carried out a time-dependent staged analysis of the structure to monitor stresses and expected deflection during construction. The firm revised the segment layout and optimised the post-tensioning layout, which reduced costs and construction time. The analysis process included developing a model, which used Bridge Information Modeling (BrIM). This allowed the synchronisation of the CADD shop drawings with the analysis model, to meet the contractor’s fast-pace construction schedule. The first of the new bridges is under construction at present and is due for completion in mid 2012. The second bridge will be finished in 2014. Archer-Western Contractors is building the two structures and FINLEY’s portion of the project includes bridge design and a full construction engineering package.

For more information on companies in this article

Related Content

  • China opens record-breaking bridge
    May 8, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o
  • China transport investment
    November 27, 2012
    In China, the news that the construction industry has been waiting for came with an announcement over infrastructure spending. The Chinese Government said it will invest heavily in infrastructure spending over the next few years, some US$157 billion, particularly in extending the country’s high speed rail network. Some $4.45 billion will be invested in transport infrastructure in 2012. Of the total, $790 million will go on rural road improvements, of which 88% will be used in the central and western regions
  • Rubber tyred rollers see key developments
    June 23, 2015
    A series of new rubber tyred asphalt compactors are now coming to market from several key manufacturers - Mike Woof writes Several of the major European compactor manufacturers are introducing new rubber tyred machines to meet demand. Pneumatic tyred rollers are often used for finishing work in road construction, due to the high quality surface they can deliver.
  • Texas highway project tackles congestion
    May 3, 2012
    A new highway project in Texas will tackle peak congestion A major highway job is underway in Texas at present where contractor Northgate Constructors, a joint venture between Kiewit & Zachary, is working on the huge DFW Connector Project. Northgate is using equipment from Guntert & Zimmerman, an S850, S600, and two TC1500s, on the job.