Skip to main content

Bridge link underway in Texas

In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls. The Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges.
March 22, 2012 Read time: 2 mins
New twin bridges at Marle Falls in Texas will carrying US 281 over the Colorado River - image courtesy of Guy Tuttle
In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls.

The 3499 Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges. This crossing is some 80km from Austin and the project requires the demolition of the existing steel truss bridge and the construction of twin segmental bridges. The new bridges will be built using the balanced cantilever construction method with end spans constructed on falsework.

Finley Engineering Group (FINLEY) carried out a time-dependent staged analysis of the structure to monitor stresses and expected deflection during construction. The firm revised the segment layout and optimised the post-tensioning layout, which reduced costs and construction time. The analysis process included developing a model, which used Bridge Information Modeling (BrIM). This allowed the synchronisation of the CADD shop drawings with the analysis model, to meet the contractor’s fast-pace construction schedule. The first of the new bridges is under construction at present and is due for completion in mid 2012. The second bridge will be finished in 2014. Archer-Western Contractors is building the two structures and FINLEY’s portion of the project includes bridge design and a full construction engineering package.

For more information on companies in this article

Related Content

  • Cleaner engines, reduced emissions
    February 17, 2012
    The forthcoming Tier 4 emissions legislation represents a great leap forward in technology, Mike Woof reports
  • Cleaner engines, reduced emissions
    April 11, 2012
    The forthcoming Tier 4 emissions legislation represents a great leap forward in technology, Mike Woof reports A high-profile focus on sustainability and reduced environmental impact is sweeping the construction sector in the European Union (EU) and the US. The EU and the US will implement regulations for the lowest emission off-road machines in history, with Canada and Japan expected to release similar regulatory programmes this year. The legislation being introduced will transform the construction indu
  • Skid steer loader - more versatile than a jack of all trades
    February 17, 2012
    The skid steer loader has for many years been known as a jack-of-all-trades. Indeed the term loader can be a bit misleading, as a skid steer is far more than simply a digging or lifting machine. Skid steers, and their more recent compact tracked loader stablemates, are the original powered tool carriers. They are designed to work with a host of attachments, not just a bucket or pallet forks. However while this concept of one base machine and a multitude of attachments has been a big success in North America
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during