Skip to main content

Bridge link underway in Texas

In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls. The Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges.
March 22, 2012 Read time: 2 mins
New twin bridges at Marle Falls in Texas will carrying US 281 over the Colorado River - image courtesy of Guy Tuttle
In the US state of Texas, work is in hand to build new bridges carrying US-281 over the Colorado River at Marble Falls.

The 3499 Texas Department of Transportation has set a budget of close to US$30 million to replace the existing Lake Marble Falls Bridge with two new bridges. This crossing is some 80km from Austin and the project requires the demolition of the existing steel truss bridge and the construction of twin segmental bridges. The new bridges will be built using the balanced cantilever construction method with end spans constructed on falsework.

Finley Engineering Group (FINLEY) carried out a time-dependent staged analysis of the structure to monitor stresses and expected deflection during construction. The firm revised the segment layout and optimised the post-tensioning layout, which reduced costs and construction time. The analysis process included developing a model, which used Bridge Information Modeling (BrIM). This allowed the synchronisation of the CADD shop drawings with the analysis model, to meet the contractor’s fast-pace construction schedule. The first of the new bridges is under construction at present and is due for completion in mid 2012. The second bridge will be finished in 2014. Archer-Western Contractors is building the two structures and FINLEY’s portion of the project includes bridge design and a full construction engineering package.

For more information on companies in this article

Related Content

  • Demolition starts for Gerald Desmond Bridge
    July 14, 2022
    The 125m-long span will be dismantled, cut and lowered onto a barge in the waters around the Port of Long Beach in the US state of California.
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.