Skip to main content

Bridge inspection unit key to maintenance

A new bridge inspection unit is carrying out vital work in Vietnam.
April 11, 2012 Read time: 1 min
The Barin Bridge inspection unit is playing a key role in ensuring inspection and maintenance on Vietnam's Cuu Long (Can Tho) bridge, which measures some 2.75km long by 23.1m wide
RSSA new bridge inspection unit is carrying out vital work in Vietnam.

Built by 1481 Barin in Italy, the AB16/S machine has been mounted on a 2394 Volvo FMII 6x2 chassis.

The inspection unit features a bucket type platform with a 300kg load, which can be used both under a bridge and for overhead work. It offers a 16m maximum underbridge reach and a maximum overhead reach of 18.7m.

Maximum vertical depth underbridge is 20m while the unit can overcome bridge barriers up to 4m high and clear pedestrian walkways 4.1m wide.

For more information on companies in this article

Related Content

  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • Safer highway containment continues to grow
    March 8, 2012
    A steady flow of new technology and systems is ensuring the highway barrier sector is seeing major gains in safety. Mike Woof reports A combination of technological development and tougher regulations are ensuring a constant flow of new safety barrier solutions for the highway sector. Issues such as containment and deflection are high on the technical agenda, while a wide array of technologies is being developed to meet specific needs for certain applications. Both in the US and Europe, an increased focus o
  • Bridge design using flow modelling techniques
    February 17, 2012
    SBG has set numerous engineering precedents with its hugely innovative Jamarat Bridge project in Saudi Arabia
  • Manitou’s new four-model Oxygen electric platform range halves maintenance costs
    October 26, 2022
    Liebherr has launched six new unplugged machines for piling and lifting applications. The piling rigs are called the LRH 100.1 and LRH 200, the drilling rigs the LB 25 and LB 30, and the crawler cranes the LR 1130.1 and LR 1160.1. The new models follow on from the firm’s original LB 16 electric drilling rig, expanding the range considerably.