Skip to main content

Bridge blast allows new Ohio River crossing

A 213m section of the Old Milton-Madison Bridge was recently blasted into the Ohio River in the United States to make way for a new river crossing. Workers rigged the structure with small controlled explosives and took it down shortly after 9.15am on Sunday 28 July 2013. Small explosive charges were placed at key locations on the bridge. The charges were detonated at intervals to control the direction of the fall. Pieces of the truss will be retrieved from the river, placed on barges, and taken to the shore
July 30, 2013 Read time: 1 min
A 213m section of the Old Milton-Madison Bridge was recently blasted into the Ohio River in the United States to make way for a new river crossing.

Workers rigged the structure with small controlled explosives and took it down shortly after 9.15am on Sunday 28 July 2013.

Small explosive charges were placed at key locations on the bridge. The charges were detonated at intervals to control the direction of the fall.

Pieces of the truss will be retrieved from the river, placed on barges, and taken to the shore for further dismantling and eventually sold for scrap.

Divers are said to be on call to ensure all pieces are removed.

Click on the video link to watch the Old Milton-Madison Bridge blast

Related Content

  • Safer blasting
    July 4, 2012
    Three years of development and field trials have resulted in the proven SparkMaster system from ASL. This sophisticated initiator is said to meet the needs of explosive engineers requiring a reliable shocktube-based system. The SparkMaster has been designed to suit an array of site conditions and can provide reliability even in challenging environments. The solid-state, ergonomically-designed unit is portable, robust, highly-visible and weighs just 700grammes. It can be operated while still inside its weath
  • 48 hours re-opening
    July 6, 2012
    Using demolition tools from Atlas Copco helped to maximise productivity on a highly time-sensitive project in Germany. The A3 autobahn runs from the Dutch/German border through the western part of the Ruhr area, the Cologne area, the Rhine-Main area and Bavaria down to the Austrian border at Stuben. It is one of the most heavily used highways in Germany and because of increasing traffic volumes, widening the road to six lanes has become necessary.
  • Bridge uses new forming carriage
    February 7, 2012
    The Holzmatttal Bridge for the A98 autobahn in southern Germany stretches 410m across the valley, and on this build the newly-developed Doka forming carriage TU is said to have demonstrated precisely how it drives progress with extremely short cycle times and speedy forming and stripping out operations. The underslung carriage also permits unobstructed access for site traffic.
  • Bridging the gap in African infrastructure
    December 20, 2013
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia.