Skip to main content

Bridge blast allows new Ohio River crossing

A 213m section of the Old Milton-Madison Bridge was recently blasted into the Ohio River in the United States to make way for a new river crossing. Workers rigged the structure with small controlled explosives and took it down shortly after 9.15am on Sunday 28 July 2013. Small explosive charges were placed at key locations on the bridge. The charges were detonated at intervals to control the direction of the fall. Pieces of the truss will be retrieved from the river, placed on barges, and taken to the shore
July 30, 2013 Read time: 1 min
A 213m section of the Old Milton-Madison Bridge was recently blasted into the Ohio River in the United States to make way for a new river crossing.

Workers rigged the structure with small controlled explosives and took it down shortly after 9.15am on Sunday 28 July 2013.

Small explosive charges were placed at key locations on the bridge. The charges were detonated at intervals to control the direction of the fall.

Pieces of the truss will be retrieved from the river, placed on barges, and taken to the shore for further dismantling and eventually sold for scrap.

Divers are said to be on call to ensure all pieces are removed.

Click on the video link to watch the Old Milton-Madison Bridge blast

Related Content

  • Eradicating work zone danger
    June 26, 2013
    New safety systems for highway work zones are helping to reduce deaths and injuries in the United States, while much work is being done in Europe to improve work zone safety. Guy Woodford reports. With more road building underway than at any one time in Texas history, the US Lone Star state’s Department of Transportation (TxDOT) is introducing its first highway safety system with queue-warning technology and temporary rumble strips to cut work zone collisions. Debuting along a central Texas stretch of the
  • Slovakian bridge defies high explosives demolition attempt
    November 15, 2012
    An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.