Skip to main content

Bridge blast allows new Ohio River crossing

A 213m section of the Old Milton-Madison Bridge was recently blasted into the Ohio River in the United States to make way for a new river crossing. Workers rigged the structure with small controlled explosives and took it down shortly after 9.15am on Sunday 28 July 2013. Small explosive charges were placed at key locations on the bridge. The charges were detonated at intervals to control the direction of the fall. Pieces of the truss will be retrieved from the river, placed on barges, and taken to the shore
July 30, 2013 Read time: 1 min
A 213m section of the Old Milton-Madison Bridge was recently blasted into the Ohio River in the United States to make way for a new river crossing.

Workers rigged the structure with small controlled explosives and took it down shortly after 9.15am on Sunday 28 July 2013.

Small explosive charges were placed at key locations on the bridge. The charges were detonated at intervals to control the direction of the fall.

Pieces of the truss will be retrieved from the river, placed on barges, and taken to the shore for further dismantling and eventually sold for scrap.

Divers are said to be on call to ensure all pieces are removed.

Click on the video link to watch the Old Milton-Madison Bridge blast

Related Content

  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f
  • Francis Scott Key Bridge demolition
    July 3, 2025
    Demolition is planned for the Francis Scott Key Bridge.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • HA dismantles footbridge over M5 in England
    January 3, 2013
    Contractors worked solidly throughout the night during one Saturday and early Sunday morning in November (2012) to dismantle the Pegwell Brake footbridge over the M5 near Bristol, south west England. The concrete footbridge, located between junctions 16 and 17, needed to be demolished to make way for a new steel pedestrian bridge suitable for high-sided vehicles to pass under when the managed motorway is fully operational and the hard shoulder is used as a running lane. The dismantling and removal of the