Skip to main content

Breakthrough on Slovakia’s D1 tunnel near Zilina

Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project. Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper. Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders. Juraj Valent, head of the Na
December 12, 2016 Read time: 2 mins
Workers in Slovakia have broken through the first of two passages in a tunnel near Zilina as part of an 11km D1 highway project.

Breakthrough of the second passage of the tunnel on the section Hricovske Podhradie-Lietavska Lucka will likely be in January. Around 80m are still to be bored, according to a report in the Slovak Spectator on-line newspaper.

Zilina is in northwestern Slovakia, around 200km from the capital Bratislava and close to the Czech and Polish borders.

Juraj Valent, head of the National Highway Company (NDS), said the section with its two tunnels and 11 bridges is scheduled for completion by October 2018. Cost is around €427 million, with money coming from the central government and the European Union.

Slovakia’s D1 motorway runs from the western border with the Czech Republic to the eastern border with the Ukraine, a 100km frontier amid remote forested areas. The government has been building and renovating the route since 1985 when a cross-country route was planned in earnest. The D1 also forms part of the European routes E50, E58, E75 E571.

Related Content

  • Widening and upgrade for highway in Nicaragua’s capital
    January 27, 2017
    Nicaragua is continuing to develop its highway network, this time with a major project planned for the capital, Managua. A loan worth close to US$107.5 million from the Central American Bank for Economic Integration (CABEI) is to help pay for the project. The work calls for the upgrade and widening of the Pista Juan Pablo II route running through Managua. The 9.55km stretch of road will benefit from three additional lanes, helping to boost capacity and reduce congestion and delays at peak periods. Safety pr
  • TensarTech supports Polish contract
    November 12, 2012
    TensarTech soil retaining walls have been used during the construction of a section of the A1 motorway in Poland. Extensive underground mining in the south of the country posed a significant challenge to building the 16km Piekary Slaskie to Pyrzowice (Katowice Airport) stretch of the motorway which, on completion, will run more than 240km from Gdansk in northern Poland to Gorzyczki on the Polish-Czech Republic border. To accommodate potential differences in settlement on embankments approaching a series of
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to
  • Upgrading Poland's roads for UEFA 2012
    May 2, 2012
    Championships in 2012. With plans in place to cohost the UEFA 2012 football championships with the Ukraine, Poland's road infrastructure is undergoing major developments to bring it up to date with the rest of the European Union. And to ensure the completed roads and pavements meet the required quality standards, Cooper Technology of Derby, UK, was awarded a contract to provide asphalt testing equipment to