Skip to main content

Brazilian bridge construction deal

A major Brazilian bridge construction deal has been agreed.
By MJ Woof November 24, 2020 Read time: 1 min
A new sea crossing is planned for Brazil – image courtesy of © Pbardocz, Dreamstime.com
An agreement has been reached for the construction of a major bridge project for Brazil. A consortium including two Chinese firms and one Brazilian contractor will build the 12.4km link, which will connect Itaparica and Salvador.

A cable-stayed design is favoured and will be the longest such sea-crossing in Latin America when complete. Construction is expected to take four years.

The consortium comprises China Railway 20 Bureau Group Corporation, China-based engineering company China Communications Construction Company (CCCC) and CCCC South America Region Company.

Related Content

  • New bridge for China
    October 28, 2020
    A new bridge will be built in China’s Hubei Province
  • Bihar crossing for Ganges River
    November 16, 2016
    A loan facility from the Asian Development Bank (ADB) will help fund work on the project to construct a new bridge over the River Ganges in India’s Bihar State. Because of the width of the river at this point, the bridge will be close to 10km in length, making it the longest in India. The new bridge will improve transport connections between the north and south of the state and the project is expected to cost around US$500 million. Building the bridge will help develop transport and trade in the area, as we
  • Strong interest in building new Chile-Argentina tunnel link
    October 30, 2013
    Interest is strong in the proposed tunnel linking Chile and Argentina. Some 37 companies have shown expressions of interest in the US$1 billion Agua Negra road tunnel. This includes 22 consortia and includes Latin American firms such as Panedile, Techint, Camargo Correa, Jose Cartellone. It also includes the Chinese firms China Railway Construction Corporation, China Railway Bureau Group, China State Construction Engineering Corporation and Sinohydro Group. Daewoo, Hyundai Engineering and SK Eng & Construct
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.