Skip to main content

Brazilian bridge being built

In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
March 23, 2015 Read time: 1 min
RSSIn Brazil the firm 2688 EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract for the bridge at present. CCR presented the weakest offer of the six groups participating in the tender. The Nova Guanabara consortium placed second in the tender process. EcoRodovias is expected to invest $402.5 million (BRL 1.3 billion) in the road over the course of the contract.

For more information on companies in this article

Related Content

  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • The new agile world of the construction equipment industry
    June 22, 2015
    while worldwide for 2015 a crystalball would be helpful, in Europe the sector has already listed specific priorities it wants to tackle, and among these are the upcoming emissions regulations (see separate story), external trade and access to foreign markets, and market surveillance.
  • UK highways need ‘€33.52 billion spend’
    July 3, 2012
    A new section of Hungary’s M6 highway, Phase III, is now open to traffic. This is one of the largest infrastructure deals in Hungary. The M6 Phase III Motorway between Dunaújváros and Szekszárd is being run under a 30-year concession awarded by the Republic of Hungary under a design, build, finance, maintain and operate contract. The 65km dual carriageway link forms the central section of the M6 highway linking Budapest to Pecs in the South of Hungary. Eight traffic junctions have been built to ensure conne
  • New Cameroon highway project planned
    July 10, 2017
    Plans are being drawn up in Cameroon for the construction of a new highway that will connect Douala with Limbé. The French contractor Egis is now commencing work on a feasibility study for the project.