Skip to main content

Brazilian bridge being built

In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
March 23, 2015 Read time: 1 min
RSSIn Brazil the firm 2688 EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract for the bridge at present. CCR presented the weakest offer of the six groups participating in the tender. The Nova Guanabara consortium placed second in the tender process. EcoRodovias is expected to invest $402.5 million (BRL 1.3 billion) in the road over the course of the contract.

For more information on companies in this article

Related Content

  • New lanes open on New Jersey Turnpike
    October 31, 2014
    The New Jersey Turnpike Authority has opened new lanes on the New Jersey Turnpike between Interchange 6 and 9.
  • JMT and Parsons get a Nice Bridge contract in the US state of Maryland
    July 7, 2015
    In the US state of Maryland, a joint venture of Johnson, Mirmiran & Thompson (JMT) and Parsons Brinckerhoff has won a contract to replace the Harry W. Nice Memorial Bridge. The Maryland Transportation Authority awarded the $1 billion contract to replace the bridge, also known as the Potomac River Bridge and which was opened in 1940. The tolled 2.7km two-lane continuous truss bridge on US 301 spans the Potomac River between Newburg in Maryland and Dahlgren in the state of Virginia. Construction of the
  • Innovative road/drainage tunnel plan for Jakarta
    February 16, 2015
    An innovative combined road and drainage tunnel is being proposed for Indonesia’s capital Jakarta. A study is underway at the moment for this novel integrated tunnel project, which is expected to cost in the region of US$1.88 billion. Work is due to commence during 2015, with the initial phase of the construction being carried out by Antaredja Mulia Jaya. The project is calling for two 12km tunnels that will help alleviate flooding in the city during periods of high rainfall as well as featuring a road. The
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia