Skip to main content

Brazilian bridge being built

In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
March 23, 2015 Read time: 1 min
RSSIn Brazil the firm 2688 EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract for the bridge at present. CCR presented the weakest offer of the six groups participating in the tender. The Nova Guanabara consortium placed second in the tender process. EcoRodovias is expected to invest $402.5 million (BRL 1.3 billion) in the road over the course of the contract.

For more information on companies in this article

Related Content

  • Luck looks to investment
    September 4, 2012
    It was in the early 1980s when Luck Stone, a third generation American crushed stone, sand and gravel company, purchased its first Philippi-Hagenbuch Heavy Duty Autogate Tailgates. Nearly 30 years later the Richmond, Virginia-based firm claims its ongoing investment in Philippi-Hagenbuch (PHIL) Heavy Duty Autogate Tailgates has saved a fortune in equipment repairs and replacements.
  • Delays for key Brazilian road projects
    March 3, 2016
    A series of major road projects in Brazil now look set to be delayed. Key road widening projects works awarded between 2012 and 2013 may now take longer than the original five year deadline to complete. Six road concession projects were awarded in the period, totalling over 3,000km of roads to be extended or upgraded. The contracts require that at least 10% of the planned work must be complete before any tolls can be charged. This initial phase has been carried out, but later stages to expand the roads have
  • Metro Pacific pushes for Cebu-Mactan bridge in the Philippines
    January 19, 2015
    Metro Pacific Investments Corp (MPIC) is in discussions to form a joint venture for construction of a toll bridge connecting the islands of Mactan and Cebu in the Philippines. Cebu is an island province that incorporates 167 surrounding islands and islets, one of them being Mactan, which lies immediately off Cebu Island, across from Cebu City. MPIC’s subsidiary, Metro Pacific Tollways Development Corp (MPTDC), is proposing an 8.3km bridge costing around US$380 million, according to local media reports
  • Major Brazilian highway tenders due this year
    January 31, 2022
    A series of major Brazilian highway tenders is due during this year.