Skip to main content

Brazilian bridge being built

In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
March 23, 2015 Read time: 1 min
RSSIn Brazil the firm 2688 EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract for the bridge at present. CCR presented the weakest offer of the six groups participating in the tender. The Nova Guanabara consortium placed second in the tender process. EcoRodovias is expected to invest $402.5 million (BRL 1.3 billion) in the road over the course of the contract.

For more information on companies in this article

Related Content

  • Wacker Neuson improves Q3 earnings in despite challenges
    November 14, 2016
    Light and compact equipment manufacturer Wacker Neuson Group saw revenue and earnings for the third quarter of 2016 increase relative to 2015. The company said that seen over a nine-month period, revenue remained at the prior-year level, balancing out the drop in earnings experienced during the first half of the year only partly. Despite adverse market factors, including ongoing crises in many emerging markets and key industries such as the agricultural sector, the oil and gas industry and mining, gro
  • Los Angeles County opts for Iteris bus signal priority
    November 6, 2013
    Building on multi-modal transit services provided over the past ten years, Iteris is to provide a multi-jurisdiction bus traffic signal priority system (BSP) for Torrance Transit’s Rapid Line in Los Angeles County, California. The US$2.2 million contract includes the design, procurement, deployment, and on-going operation and maintenance of a multi-jurisdiction BSP at 83 signalised intersections. The BSP system utilises existing on-bus systems that incorporate GPS-based automatic vehicle location equipme
  • Peru's award winning road construction project
    April 16, 2012
    The South Interoceanic Road is a path of integration and development: it is also a GRAA 2011 Winning Project . On 24 January, 2012 the International Road Federation formally presented a Global Road Achievement Award (GRAA) in. the Programme Management category to Concesionaria Interoceánica Sur Tramos 2 y 3, S.A. for its leadership in the provision of integrated services as part of a large-scale transportation infrastructure programme. IIRSA Sur Concessionaire - Stretches 2 & 3, builds, provides maintenanc
  • Software tools aid construction, reduce costs
    February 28, 2012
    Integrated construction software offers an effective planning solution - *Mark Nichols writes. In a world where resources are limited, 20 year designing and building in a sustainable way is more critical than ever. By employing today's software tools it is possible to reduce the total cost of construction of a new highway, while reducing operating costs and environmental impacts. The path to achieving the greatest gains is to take a holistic approach to the plan, design, construct and operate process from t