Skip to main content

Brazilian bridge being built

In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
March 23, 2015 Read time: 1 min
RSSIn Brazil the firm 2688 EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract for the bridge at present. CCR presented the weakest offer of the six groups participating in the tender. The Nova Guanabara consortium placed second in the tender process. EcoRodovias is expected to invest $402.5 million (BRL 1.3 billion) in the road over the course of the contract.

For more information on companies in this article

Related Content

  • Dragados among six in the running for fourth Panama bridge deal
    August 23, 2016
    All six consortia that submitted documents in May to design and build a fourth bridge over the Panama Canal have pre-qualified, according to media reports. The companies officially vying for the estimated US$1 billion contract are: • Dragados • Consorcio CCB: Constructora Norberto Odebrecht, Odebrecht Engenharia e Construcao International • Consorcio Hyundai, Sacyr JV • Consorcio Astaldi – Daelim • Consorcio Panamá Cuarto Puente: China Communications Contruction Company, China Harbour Engi
  • Spencer wins Menai Suspension Bridge refurb
    September 16, 2022
    The UK contract, worth nearly €1.8 million, is to repaint the entire main span underdeck of the 417m-long bridge, the second oldest operational vehicular suspension bridge in the world.
  • East Africa’s dream of a ‘Silk Road’ in sight
    October 22, 2021
    East Africa’s dream of a ‘Silk Road’ route to boost trade and transport is now in sight
  • Budimex consortium win Poland’s Ostroda ringroad court case
    March 18, 2015
    A district court in the Polish town of Olsztyn has ruled in favour of a consortium of Budimex and Ferrovial Agroman which challenged the awarding of a ringroad contract to a rival. The ruling means that the Salini consortium’s winning bid for the construction of a ringroad around Ostroda is overturned on the basis that it was ineffectually low. This means that the contract will go to the Budimex consortium which proposed to build the road for around €223 million. Polish builder Budimex is the consortium's m