Skip to main content

Brazil transportation programme

Plans are being formulated in Brazil for second phase of the country’s logistics investment programme, PIL. This looks set to include 15 road sections, 11 of which are still in the project development phase. Other sections are in the public consultation phase, or waiting to be analysed by the Brazilian authorities. The projects for the BR 476-153-282-480 sections in Parana and Santa Catarina states are ready to be put to tender. Meanwhile the BR 364-365 sections in Goias and Minas Gerais states, are current
March 10, 2016 Read time: 2 mins
Plans are being formulated in Brazil for second phase of the country’s logistics investment programme, PIL. This looks set to include 15 road sections, 11 of which are still in the project development phase. Other sections are in the public consultation phase, or waiting to be analysed by the Brazilian authorities. The projects for the BR 476-153-282-480 sections in Parana and Santa Catarina states are ready to be put to tender. Meanwhile the BR 364-365 sections in Goias and Minas Gerais states, are currently being analysed by the Brazilian authorities. These two sections are expected to be offered in tenders in the first half of 2016. Meanwhile the remaining 13 sections are set to be offered in tenders in the second half of 2016. Road sections in the programme total some 7,000km and include investments of around US$17.56 billion in all. The second phase of the PIL programme also includes concessions for five railway sections and four airports in the states of Rio Grande do Sul, Santa Catarina, Ceara and Bahia.

Related Content

  • Vietnam sets highway plan of action
    May 28, 2012
    Additional funding is being sought for the third stage of a project that will upgrade the 3,010km Ho Chi Minh Highway in Vietnam. The third phase of the project has an estimated investment capital of some US$14.7 billion and foreign and local investors are being invited to invest in the road through different funding structures. The funding models will include the proven build-transfer-operate (BTO), build-transfer (BT) and build-operate-transfer (BOT) systems, with from 20%-30% of the funding to come from
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Safe and efficient urban mobility for Africa
    March 16, 2023
    The African Development Bank (AfDB) and the International Road Federation have jointly launched a new capacity strengthening program aimed at improving safe and sustainable urban transport planning and project preparation for African cities.
  • 2-4 year-old construction equipment tops buyer ‘wish list’
    May 11, 2012
    A leading used construction equipment auctioneer firm boss believes equipment aged between 2 and 4 years is now topping buyers’ ‘wish lists’, as 1 to 2-year-old used stocks deplete. Jonnie Keys, General Manager of Euro Auctions, said that with the cost of new equipment currently up by around 20% on prices in June 2009, the used market is still strong. “Euro Auctions has repeatedly seen over 30% of all plant sold leaving the UK and Europe for projects in Australia, South Africa, South America, Central Ameri