Skip to main content

Brazil-Paraguay bridge project underway

A new bridge connecting Presidente Franco in Paraguay with Foz do Iguaçu in Brazil is now being built. The bridge will be the second spanning the Parana River in the area and is costing US$84.35 million to construct. The present Puente Internacional de la Amistad connection joins Paraguay’s Route 7 with Brazil’s Route 277 but is no longer able to cope with demand. The new bridge will carry all the heavy truck traffic passing this important international border when it opens, with the existing structure bein
August 12, 2019 Read time: 1 min

A new bridge connecting Presidente Franco in Paraguay with Foz do Iguaçu in Brazil is now being built. The bridge will be the second spanning the Parana River in the area and is costing US$84.35 million to construct. The present Puente Internacional de la Amistad connection joins Paraguay’s Route 7 with Brazil’s Route 277 but is no longer able to cope with demand. The new bridge will carry all the heavy truck traffic passing this important international border when it opens, with the existing structure being left to carry light vehicles only. A consortium comprising Construbase, Cidade and Paulitec is carrying out the bridge construction contract.

Related Content

  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Russian bridge project well underway
    November 3, 2017
    Construction work on Russia’s Frunzensky Bridge is now well under way. The bridge spans the Samara River, a tributary of the Volga River and was originally planned for completion by 2018. The construction company Stroytransgaz has a US$213.5 million contract to finish the project and the bridge is now expected to be ready for traffic by 2020. The bridge project did face challenges from insufficient funding and cost increases but the necessary financing package is now in place. When complete the bridge is in
  • Tunnel construction at Mexican extraction operation
    April 16, 2018
    The innovative Carmix 3500 TC unit is now being put to work at the Concheño underground extraction operation in Mexico This operation in the state of Chihuahua was opened in 2013 and can produce 15000tonnes/day. In this context, Minera Real de Angeles opted for four Carmix 3500 TC machines for the construction of access roads. The machine is said to be both versatile and productive, while its comparatively compact dimensions are well suited to underground use. The unit was supplied to the customer by Car