Skip to main content

Brazil-Paraguay bridge project underway

A new bridge connecting Presidente Franco in Paraguay with Foz do Iguaçu in Brazil is now being built. The bridge will be the second spanning the Parana River in the area and is costing US$84.35 million to construct. The present Puente Internacional de la Amistad connection joins Paraguay’s Route 7 with Brazil’s Route 277 but is no longer able to cope with demand. The new bridge will carry all the heavy truck traffic passing this important international border when it opens, with the existing structure bein
August 12, 2019 Read time: 1 min

A new bridge connecting Presidente Franco in Paraguay with Foz do Iguaçu in Brazil is now being built. The bridge will be the second spanning the Parana River in the area and is costing US$84.35 million to construct. The present Puente Internacional de la Amistad connection joins Paraguay’s Route 7 with Brazil’s Route 277 but is no longer able to cope with demand. The new bridge will carry all the heavy truck traffic passing this important international border when it opens, with the existing structure being left to carry light vehicles only. A consortium comprising Construbase, Cidade and Paulitec is carrying out the bridge construction contract.

Related Content

  • Work underway on key Nicaragua road link
    November 11, 2013
    Work is now underway on the Empalme Nejapa-Empalme Puerto Sandino highway in Nicaragua. The project is costing some US$40 million and the road forms part of the route connecting capital Managua with the country’s second largest city, Leon. Survey work is determining whether the road requires additional structural improvements and also to see if the budget is sufficient to widen the section to four lanes. The section of road will be constructed from concrete with a thickness of 180mm and it is expected to la
  • Successful explosive demolition of old bridge in US state of Missouri
    December 16, 2013
    A successful explosive demolition has been carried out of the Hurricane Deck Bridge in the US state of Missouri. The Hurricane Deck Bridge carried Missouri Route 5 over Lake of the Ozarks and measured 695m long. The structure was no longer able to cope with the traffic volumes it was carrying and the Missouri Department of Transport (MODOT) opted to build a new delta frame bridge to replace it. Work started on the new bridge in 2012 and this was opened to traffic in September 2013. The steel span Hurricane
  • Demolition underway on bridge structure in Cleveland, Ohio
    June 9, 2014
    Demolition work is progressing on track on the old Innerbelt Bridge in the US city of Cleveland and spanning the Cuyahoga River. At present a demolition contractor is breaking up the structure in stages, using cutting gear and cranes to remove portions of the bridge in a phased programme of works. Once the demolition moves to a certain stage in a few months, the contractor will then be able to use explosives to demolish the remaining structure. Four of the truss bridge’s nine spans are being dismantled usi
  • Chinese firm wins highways expansion project to decongest Nairobi
    January 5, 2017
    A Chinese contractor is carrying out a major road project intended to cut congestion in Kenyan capital Nairobi – Shem Oirere writes Chinese contractor China Wu Yi has won a US$163 million contract for the reconstruction and expansion of a 25km highway leading out of Kenya’s capital Nairobi with financing from the World Bank. The contract was awarded by the country’s National Highways Authority (KeNHA), a state-owned road agency responsible for the management, development, rehabilitation and maintenance of i