Skip to main content

Brazil invests US$18.3 billion in highways during phase 2 of PAC

Brazil has invested US$18.3 billion (43.8 billion reais) on federal highway projects during phase 2 of PAC, the country’s growth acceleration plan, according to the federal government's 9th balance report on PAC 2 works. The report, reviewing phase 2's first three years (2011-13) of the four-year programme, states that work was carried out on 3,080km of highway stretches and highlights a number of projects completed last year. Among them was the BR-376 near southern Paraná state's Maringá city, the BR-448
February 26, 2014 Read time: 2 mins
Brazil has invested US$18.3 billion (43.8 billion reais) on federal highway projects during phase 2 of PAC, the country’s growth acceleration plan, according to the federal government's 9th balance report on PAC 2 works.

The report, reviewing phase 2's first three years (2011-13) of the four-year programme, states that work was carried out on 3,080km of highway stretches and highlights a number of projects completed last year.

Among them was the BR-376 near southern Paraná state's Maringá city, the BR-448 known as Rodovia do Parque in the southern state of Rio Grande do Sul, and the BR-324 known as Via Expressa near northeastern Bahia state's Salvador port.

Projects on another 6,915km of roads are currently underway: a total of 4,367km is for restoration and paving and 2,548km for road widening and expansion, the report said.

Overall PAC 2 works, which include transport infrastructure, basic sanitation and urban mobility, electric energy, housing, and other projects, saw a total of $328.85 billion (773 billion reais) in investments from 2011-13. The four-year phase ends this December.

Related Content

  • Brazilian project attracts strong interest
    April 30, 2012
    Interest is strong in Brazil’s BR-101 highway project. The tender for the project will open on 18th January 2012. According to Brazil's Land Transport Agency (ANTT), at least six groups, most Brazilian, have shown interest in the project. The stretch to be put out to tender totals 476km, of which 458km is in Espirito Santo. The ANTT states that US$1.24 billion will be invested in the BR-101, with plans to widen the highway in stages. The concession period for the road totals 25 years and the highway will fe
  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • $42 million surfacing: Brazil’s MS-347 highway
    June 16, 2025
    $42 million of surfacing work will be carried out for a stretch of Brazil’s MS-347 highway.