Skip to main content

Bratislava bypass and Karpaty tunnel completion set for 2030

Slovakia’s national motorway company NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030. The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”. Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves t
June 18, 2018 Read time: 2 mins
Slovakia’s national motorway company 5891 NDS expects that the Bratislava bypass on the D4 motorway together with the Karpaty tunnel will be completed around 2030.


The D4 motorway is part of the trans-European transport network and will connect with the planned R7 expressway linking western and eastern Slovakia, and the existing D1 and D2 motorways”.

Apart from construction works on part of the D4 motorway, another two stretches are planned on this link, including the 3.6km stretch from Devinska Nova Ves to the Slovak-Austrian border. Completion for this is around 2026.

The second stretch, which will be 12.4 km from Raca to Zahorska Bystrica in Bratislava and will include the 11km Karpaty tunnel.

The D4 Bratislava, Raca - Bratislava, Zahorska Bystrica stretch should be completed around the year 2030.

The D4/R7 Bratislava project will reportedly cost the Slovak Republic around €1.76 billion in total during the three decades
of concession. This includes construction and 30 years of operation and maintenance.

Meanwhile, Ladislav Dudas, investment director at NDS, said the realistic date for completion of the D1 motorway linking Bratislava and Kosice is 2025. The stretch Hubova - Turany is the only D1 stretch that is not under construction; as well, no tender is underway.

NDS said it is working on land planning documents for the Korbelka tunnel, part of Hubova - Turany stretch. A tender for this stretch, worth around €870 million could be launched in 2020 with completion of construction around 2025. Preparation works for this project should cost around €14 miilion.

In mid-2016, the government said the Korbelka tunnel alone could cost €278 million, according to a report in Pravda Slovakia.

But the chosen 6km route is a safer option than another route alongside the Vah River that would have taken in a potential landslide area. Because of the slide risk, a further €202 million would be needed to shore up the hillside.

At the time, the newspaper Pravada Slovakia noted that work would not start likely until 2019.

For more information on companies in this article

Related Content

  • Lueg Bridge work sparks congestion fears
    June 23, 2022
    Lueg Bridge, along Austria’s section of the Brenner Pass route, is slated for major rehabilitation work as part of upgrades to the tolled motorway.
  • Slovakia tunnel excavation complete
    September 21, 2018
    Excavation work on Slovakia’s Visnove Tunnel has now been completed. Driving the tunnel took nine months longer than originally anticipated. The 7.5km tunnel will be Europe’s seventh longest when complete and forms part of the D1 highway between Dubna Skala and Lietavska. Work on this highway started in 2014, with the construction being carried out jointly by Italian contractor Salini Impregilo and local firm Duha. Fitting out of the tunnel is now commencing, with equipment such as ventilation and traffic
  • Bids in for Vukosavlje-Raca motorway
    October 30, 2020
    The tender for the 70km motorway within Bosnia’s Republika Srpska is divided into three lots.
  • Tunnel Boom in Central and Eastern Europe
    September 15, 2015
    Following the success of the 41st World Tunnel Congress held in Croatia last May, World Highways looks at two signi_ cant projects in Slovakia and Serbia – Adriana Potts reports Central and Eastern Europe is buzzing with a number of major projects being developed - including highways, bridges and tunnels – and with many more in the pipeline. The region is expected to be highly active with plans for developing infrastructure in the next two decades, according to Davorin Koli , president of the Croatian