Skip to main content

Bosnia highway deal going ahead

The package of works to construct the Pocitelj-Zvirovici stretch of the Corridor VC motorway in Bosnia has been awarded to two Chinese contractors. The 11km stretch of the route will cost nearly €103 million to build. The work will be handled jointly by the Synohydro Power Company and China State Construction Engineering Company. The package of works was awarded by Bosnia’s motorway company, Autoceste Federacije BiH. A portion of the funding required is being provided by the European Investment Bank (EIB).
June 12, 2019 Read time: 1 min

The package of works to construct the Pocitelj-Zvirovici stretch of the Corridor VC motorway in Bosnia has been awarded to two Chinese contractors. The 11km stretch of the route will cost nearly €103 million to build. The work will be handled jointly by the Synohydro Power Company and China State Construction Engineering Company. The package of works was awarded by Bosnia’s motorway company, Autoceste Federacije BiH. A portion of the funding required is being provided by the European Investment Bank (EIB).

Related Content

  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • $600 million Louisiana toll road to go ahead
    June 5, 2025
    A $600 million Louisiana toll road project has been given the go ahead.
  • The doors open on a record-breaking bauma China 2018
    November 22, 2018
    You can tell a lot from numbers – and this year’s bauma China exhibition is set to be a record-breaker! The exhibitor numbers represent an impressive 11% increase on the 2,958 exhibitors from 41 countries that presented their products and innovations to around 170,000 visitors at the 2016 event.
  • Progress on Serbia’s Zezeljev bridge replacement is slow
    August 30, 2017
    Construction of the Zezeljev rail and road bridge across the Danube River is facing further delays, according to the Serbian government. Work on the 470m-long new bridge was supposed to be finished by this month. But national elections and changes of government have hampered progress, Serbian media have reported. The original bridge was completed in 1961 as a single-track railway line and separate roadway between the cities of Novi Sad and Petrovaradin. NATO attacked the structure five times during its camp