Skip to main content

Border bridge being built between Thailand and Myanmar

A new border bridge is being built between Thailand and Myanmar. The second Friendship Bridge will connect Mae Sot in Thailand with Myawaddy in Myanmar, spanning the River Moei. The project is expected to cost some US$93.9 million. Construction will commence in early 2015 and the structure is expected to be completed by the end of 2015. The bridge will be designed with a weight capacity of 100tonnes.
August 27, 2014 Read time: 1 min

A new border bridge is being built between Thailand and Myanmar. The second Friendship Bridge will connect Mae Sot in Thailand with Myawaddy in Myanmar, spanning the River Moei. The project is expected to cost some US$93.9 million. Construction will commence in early 2015 and the structure is expected to be completed by the end of 2015. The bridge will be designed with a weight capacity of 100tonnes.

Related Content

  • International firms compete in US bridge project tenders
    May 2, 2012
    The Spanish construction firm ACS is tendering for the construction and operation of four bridges in the US. The firm is tendering in partnership with some other US and international firms for some of the projects, which are worth a total of US$11.4 billion. The Tappan Zee project is expected to cost $5 billion and the deal will be for a design and construction contract. The bridge will be located in New York, is being developed by New York State Thruway Authority and will require two, four-carriageway brid
  • Myanmar elevated expressway project
    September 21, 2018
    Discussions are being held in Myanmar with regard to the country’s Elevated Expressway Project. The Myanmar Government has been in talks with the International Finance Corporation (IFC). The project is expected to cost US$400 million, with work due to commence in 2019 and likely to require 24-36 months to complete. Building the 24km expressway will improve transport between the north and south of Yangon City. The project will be carried out under the PPP model, with IFC advising on the work.
  • New Myanmar highway project awarded
    September 14, 2017
    A new highway project worth US$184 million has been awarded in Myanmar to a joint venture comprising Punj Lloyd and Varaha Infrastructure. The project will see the construction of an improved road link measuring 120km connecting Yagyi with Kalewa. The work is expected to take three years to complete and will include the construction of three large bridges as well as two small bridges.
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.