Skip to main content

Bordeaux gets sixth bridge, Simone Veil Bridge, formerly JJ Bosc

The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River. The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge. The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.
July 11, 2017 Read time: 2 mins
The proposed Simone Veil Bridge in Bordeaux (photo courtesy of OMA REM Koolhaas-Clement Blanchet Architects)

The French city of Bordeaux has awarded Razel-Bec a contract for construction of a new bridge across the Garonne River.
 
The city of Bordeaux awarded Razel-Bec one of the largest urban development project in France, construction of the Simone Veil Bridge.

The 550m bridge over the River Garonne will be 45m wide and lie between Bordeaux and the city of Floriac. Construction will start in September and take around 32 months. Cost will be nearly €83.9 million.

The consortium led by civil contractor Razel-Bec includes 217 Fayat TP for the earthworks, drainage works and roads and utilities, Sefi intrafor for the special foundations, ETPO for in-river works, Baudin Chateauneuf together with Barbot for roof-framing works.
 
The bridge, as designed by Rem Koolhaas and Clément Blanchet of OMA architecture firm, will accommodate various forms of urban mobility and “constitutes both a link and a living space”.
 
A video focusing on design of the bridge is available on the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Facebook page of OMA Facebook page of OMA Link false http://www.facebook.com/pg/razelbecfayat/videos/?ref=page_internal false false%>.

Until Veil’s death in June, the bridge was to be called the Jean-Jacques Bosc Bridge after the prominent 19th century Bordeaux businessman and politician.

Simone Veil was a French lawyer and politician who served as minister of health under French president Valéry Giscard d'Estaing from 1993 to 1995. She was also president of the European Parliament and a member of the Constitutional Council of France.

Bordeaux has five road bridges across the Garonne. The oldest is the Pont de pierre, built in the 1820s and three modern bridges built after 1960: the Pont Saint Jean, the suspension Pont d'Aquitaine and the Pont François Mitterrand. Aquitaine and Mitterand bridges are part of the Bordeaux the ring road.

The fifth bridge, the Pont Jacques-Chaban-Delmas, was finished was opened to traffic in early 2013. It is a vertical-lift bridge with a height comparable to the Pont de pierre in closed position and to the Pont d'Aquitaine in open position.

All five road bridges, including the two highway bridges, are open to cyclists and pedestrians, as will be the Pont Simone Veil.

For more information on companies in this article

Related Content

  • HAZEMAG combines roller screen/feeder breaker
    February 13, 2013
    HAZEMAG has realised an intelligent, efficient, compact secondary crushing preparation plant with a minimised overall height for the production of 1,500tonnes/hour of lignite following an order last year from P.T Indonesia Pratama, Indonesia. It was the customer’s wish to get an intelligent crushing solution and a low overall height of the preparation plant. HAZEMAG combined a roller screen with the field-tested feeder breaker HFB 0714, thus offering screening and crushing in one unit, which has dimensions
  • NDT sensor fusion in structural pavement condition surveys
    February 27, 2017
    Early detection of pavement defects and the causes of deterioration is essential for effective maintenance planning, writes Dr Alena Uus* There is a need for optimisation and development of UK highway survey methods that would provide comprehensive information on the surface and subsurface pavement condition and operate at traffic speed, which eliminates the requirement for lane closures. Performance of non-destructive testing (NDT) methods commonly employed in pavement condition surveys can be potent
  • The IRF is showcasing achievement with its awards
    August 18, 2015
    Winners of the 2015 Global Road Achievement Awards Announced This year the IRF honoured 12 projects from around the world, each leading the way in innovation across major road and highway disciplines. The selection was made by an international panel of senior road development specialists. "Much of the transport sector's accomplishments are unnoticed by the hundreds of millions of people who benefit so greatly from the availability of safe, smart and interconnected road networks," said IRF chairman Abd
  • JCCBI says US$300m for demolishing Montreal’s old Champlain Bridge
    April 11, 2017
    Tearing down the old steel truss cantilever Champlain Bridge in Montreal could cost around US$300 million, according to preliminary estimates by a federal government agency. Also, until the nearby new Champlain Bridge is finished, it will cost US$93 million annually to maintain the old one, according to Jacques Cartier and Champlain Bridges Incorporated (JCCBI), the federal Canadian agency that oversees several major road infrastructure assets in the city. Dismantling will start in 2019 at the earliest and