Skip to main content

Bolivia highway complete – built by IBT

Miami-based firm IBT has completed its construction work on a highway link in Bolivia’s Chaco Region. The project cost US$84 million to carry out and is of importance to Bolivia, as it will improve transport connections and improve trade and tourism in the area. The improved route will also make a major boost to safety as the original road had the reputation of being one of the 10 most dangerous mountain roads anywhere in the world. The 61km highway project included moving 5.4 million m3 of earth before the
June 1, 2018 Read time: 2 mins
Bolivia’s president, Evo Morales, opened the new 61km road link in the country’s Chaco Region, which was built by IBT

Miami-based firm IBT has completed its construction work on a highway link in Bolivia’s Chaco Region. The project cost US$84 million to carry out and is of importance to Bolivia, as it will improve transport connections and improve trade and tourism in the area. The improved route will also make a major boost to safety as the original road had the reputation of being one of the 10 most dangerous mountain roads anywhere in the world.

The 61km highway project included moving 5.4 million m3 of earth before the asphalt could be laid. "It was a massive earth-moving effort with a tremendous outcome. As a result, drivers are able to drive faster and safer, reducing their travel time by more than two hours,” said Daniel Toledano, managing director and chief operating officer of IBT.

Built by IBT’s parent company Eurofinsa, the Entre Ríos-Palos Blancos Highway crisscrosses six rivers, large ravines, and six mountainous areas with water falls more than 100m high, making it the most relevant and complex project connecting the city of Tarija with O'Connor Province and Gran Chaco province. The project required the construction of three new bridges, more than 200 transverse drainages and other hydraulic infrastructures that help to ensure the road is passable during the rainy season.

The city and provinces are in the department of Tarija in southeastern Bolivia, which borders Argentina to the south and Paraguay to the east. According to the 2012 census, the Tarija department has a population of 482,196 inhabitants.

Bolivian president Evo Morales and local authorities inaugurated the two-lane highway with a celebratory party that included a caravan, traditional dances and rituals characteristic of the region.

Another important milestone was the rescue and conservation of pre-Hispanic urns and ceramics found at the Tacuarandí site, located in the community of the same name, which were delivered in August 2017 to the Isidora Ortiz Cultural Center and Municipal Museum in the municipality of Entre Ríos.

Related Content

  • Storstrom Bridge to be Denmark’s third longest
    March 8, 2018
    Form and functionality come together in Denmark’s latest Storstrom Bridge design. David Arminas reports. An Italian joint venture recently won the construction contract for what will be one of Denmark’s longest bridges, the replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate - Vejdirektoratet - awarded the work to a joint venture of Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €550 milli
  • Paraguay-Argentina bridge design
    May 26, 2021
    The design for the new Paraguay-Argentina bridge project is being finalised.
  • Mexican bridge celebration
    March 22, 2012
    Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world.
  • Lanes removes 400tonnes of debris from flood-scheme tunnel in UK
    March 28, 2017
    It was “dirty work” for drainage engineers from Lanes Group in the UK when they recently removed 400tonnes of silt and debris from a culvert in northern England. Before sludge removal started, the 3m-wide concrete box culvert under the A38 on the outskirts of the city of Derby had been full almost to its roof. Lanes Group's East Midlands depot, based in Derby, desilted the culvert in a 17-day operation for North Midland Construction, working for Highways England, under its civil engineering framework.