Skip to main content

Bilbao plan to cut congestion

Bilbao in northern Spain is suffering from increasing levels of vehicle congestion, a problem the city authorities intend to tackle. Two major civil engineering projects have been proposed in a bid to address the problem. One of the projects would be to drive a 3km tunnel under the main estuary, improving transport and traffic flow between the north and south of the city. The tender process for a feasibility study into this project I being put to tender. Meanwhile the second major project proposed would be
May 15, 2018 Read time: 1 min

Bilbao in northern Spain is suffering from increasing levels of vehicle congestion, a problem the city authorities intend to tackle. Two major civil engineering projects have been proposed in a bid to address the problem. One of the projects would be to drive a 3km tunnel under the main estuary, improving transport and traffic flow between the north and south of the city. The tender process for a feasibility study into this project I being put to tender.

Meanwhile the second major project proposed would be to extend the existing Supersur highway so as to improve access to the southern side of the city. In all the two projects are expected to cost a total of €580 million. If all goes to plan, the two links should be ready for traffic by 2027.

Related Content

  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Chile-Argentina tunnel loan for bidding
    December 14, 2016
    Further progress is being made with the Agua Negra Tunnel project, which will connect Chile with Argentina. A loan worth US$40 million is being provided by the Inter-American Development Bank (IADB). This loan will help deliver the bidding process for the project. Several bidders are being pre-qualified for the tender process. Construction of the tunnel itself is expected to take eight ant a half years with the work estimated to cost $1.6 billion. The tunnel will provide a safer and more reliable route than
  • Plans are moving ahead on the new Argentina-Chile tunnel
    June 24, 2013
    Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
  • Connected vehicles: implications for road networks and mobility
    May 15, 2019
    Mobility services are expected to undergo spectacular changes within the next two decades with the introduction and widespread use of connected and autonomous vehicle (CAV) technology. However, the transition phase from human driving to self-driving will be gradual, requiring incremental interventions on the physical and digital road network to allow it to cope with mixed vehicular traffic. Cities such as Dubai have embraced the challenge by setting a target to reach 25% driverless trips by 2030 as part o