Skip to main content

BESIX-MTH awards Nordhavn work to Bravida

Bravida Denmark, on behalf of the BESIX-MTH joint venture, will install plumbing, electricity, ventilation, road lighting and light signals for Copenhagen’s Nordhavn Tunnel.
By David Arminas February 5, 2024 Read time: 2 mins
Preparation work started last May on the 1.4km-long Nordhavn Tunnel which will be an extension of a 620m-long cut-and-cover tunnel that is part of the Nordhavnsvej project (image courtesy the Danish Road Directorate, Vejdirektoratet)

The BESIX-MTH joint venture has appointed Bravida Denmark for installation work on the Nordhavn Tunnel project in Copenhagen.

The project, worth more €26.7 million, includes a new stage from Svanemøllen to Nordhavn. Design and planning work is already underway, with production set to start in 2024 and expected completion in summer 2027.

Bravida's work includes installation of plumbing, electricity, ventilation, road lighting and light signals, said Nikolaj Bøhmer Jensen, a regional director at Bravida Denmark.

Bravida is a subcontractor to the joint-venture partnership BESIX-MTH and has worked in close collaboration since the project’s start, noted Michael Benedict Thulstrup, deputy project director at BESIX-MTH. The joint venture also is working closely with one of Denmark’s largest infrastructure contractors, MT Højgaard Danmark and together have worked on Stockholm’s E4 tunnel.

The Nordhavn Tunnel will offer more direct access to the urban development areas in both outer and inner Nordhavn. It will also improve access to harbour activities in the area and divert a significant portion of heavy traffic from Østerbro's road network.

Vejdirektoratet, the Danish Road Directorate, in collaboration with the city of Copenhagen and By & Havn, is overseeing the construction of the Nordhavn Tunnel. By & Havn is tasked with developing Ørestad and the port of Copenhagen  and runs the daily operations of the port through its subsidiary, Copenhagen Malmö Port.

Preparation work started last May on the 1.4km-long Nordhavn Tunnel which will be an extension of a 620m-long cut-and-cover tunnel that is part of the Nordhavnsvej project.

The Nordhavnsvej – or Northern Harbour Link - is a 3km-long four-lane two-tube bypass being built between Nordhavn and Helsingørmotorvejen (Elsinore Highway) in northern Copenhagen, Denmark. At €$323 million, the project was Copenhagen’s largest road infrastructure project in the past 50 years. The road runs through the heavily populated downtown district and improves the connection between the Helsingør motorway and the northern port area of the capital city.

Nordhavnsvej Consortium comprised E Pihl & Søn and Ed. Züblin is responsible for the construction and operation of the project, and includes five-year maintenance of the tunnel. Formwork design and installation was done by PERI Group.

Ramboll was the client’s general consultant responsible for all phases of the project, from planning, preliminary design and environmental impact assessment to tender design and supervision.

For more information on companies in this article

Related Content

  • Demolition starts for Gerald Desmond Bridge
    July 14, 2022
    The 125m-long span will be dismantled, cut and lowered onto a barge in the waters around the Port of Long Beach in the US state of California.
  • EastLink tollway a winner at the 9th ITS Australia National Awards
    June 4, 2019
    The Freeway Tunnel Ventilation On-Demand System for Melbourne’s EastLink project picked up the top Industry Award category at the recent 9th ITS Australia National Awards Traditional tunnel ventilation systems are inefficient. Fans operate at fixed speed in manual mode or with individual fans programmed to switch on and off at preset times to ensure zero portal emissions with all emissions dispersed via ventilation stacks. EastLink’s new ventilation on demand – VoD - system matches variable speed fan
  • Bilbao benefits from major tunnel project
    February 10, 2012
    The northern Spanish city of Bilbao looks set to benefit from a major tunnel construction project aimed at reducing traffic congestion on its vehicle clogged streets. The city is building a new underground metro section, Line 3, which will help carry commuters to and from the city's commercial centre and help reduce vehicle journey times on the surface. This project is also making use of the latest piece of tunnelling equipment from Sandvik, the MT520 roadheader, a powerful machine designed and built at
  • Webuild proposes Baltimore Bridge design
    May 6, 2024
    VIDEO: The project in the US state of Maryland to replace the collapsed Francis Scott Key Bridge was made free of charge ahead of tomorrow’s state-led virtual industry forum for reconstruction of the bridge.