Skip to main content

BESIX-MTH awards Nordhavn work to Bravida

Bravida Denmark, on behalf of the BESIX-MTH joint venture, will install plumbing, electricity, ventilation, road lighting and light signals for Copenhagen’s Nordhavn Tunnel.
By David Arminas February 5, 2024 Read time: 2 mins
Preparation work started last May on the 1.4km-long Nordhavn Tunnel which will be an extension of a 620m-long cut-and-cover tunnel that is part of the Nordhavnsvej project (image courtesy the Danish Road Directorate, Vejdirektoratet)

The BESIX-MTH joint venture has appointed Bravida Denmark for installation work on the Nordhavn Tunnel project in Copenhagen.

The project, worth more €26.7 million, includes a new stage from Svanemøllen to Nordhavn. Design and planning work is already underway, with production set to start in 2024 and expected completion in summer 2027.

Bravida's work includes installation of plumbing, electricity, ventilation, road lighting and light signals, said Nikolaj Bøhmer Jensen, a regional director at Bravida Denmark.

Bravida is a subcontractor to the joint-venture partnership BESIX-MTH and has worked in close collaboration since the project’s start, noted Michael Benedict Thulstrup, deputy project director at BESIX-MTH. The joint venture also is working closely with one of Denmark’s largest infrastructure contractors, MT Højgaard Danmark and together have worked on Stockholm’s E4 tunnel.

The Nordhavn Tunnel will offer more direct access to the urban development areas in both outer and inner Nordhavn. It will also improve access to harbour activities in the area and divert a significant portion of heavy traffic from Østerbro's road network.

Vejdirektoratet, the Danish Road Directorate, in collaboration with the city of Copenhagen and By & Havn, is overseeing the construction of the Nordhavn Tunnel. By & Havn is tasked with developing Ørestad and the port of Copenhagen  and runs the daily operations of the port through its subsidiary, Copenhagen Malmö Port.

Preparation work started last May on the 1.4km-long Nordhavn Tunnel which will be an extension of a 620m-long cut-and-cover tunnel that is part of the Nordhavnsvej project.

The Nordhavnsvej – or Northern Harbour Link - is a 3km-long four-lane two-tube bypass being built between Nordhavn and Helsingørmotorvejen (Elsinore Highway) in northern Copenhagen, Denmark. At €$323 million, the project was Copenhagen’s largest road infrastructure project in the past 50 years. The road runs through the heavily populated downtown district and improves the connection between the Helsingør motorway and the northern port area of the capital city.

Nordhavnsvej Consortium comprised E Pihl & Søn and Ed. Züblin is responsible for the construction and operation of the project, and includes five-year maintenance of the tunnel. Formwork design and installation was done by PERI Group.

Ramboll was the client’s general consultant responsible for all phases of the project, from planning, preliminary design and environmental impact assessment to tender design and supervision.

For more information on companies in this article

Related Content

  • Bentley presents awards for engineering excellence
    November 5, 2015
    Innovation in infrastructure engineering was highlighted at the annual Bentley Systems awards ceremony, held in London’s Metropole Hotel. A series of major project were given awards for the innovative ways in which software from Bentley has been used to deliver challenging projects more quickly and efficiently. Prior to the event teams of jurors had already viewed a wide range of entrants across many engineering disciplines, selecting three finalists in each category. The jurors then met at the event and
  • Egypt’s canal tunnel project
    May 16, 2018
    Major progress is being achieved on Egypt’s key tunnel project, a link that runs underneath the Suez Canal.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • BAUER involved in constructing a tunnel under the Suez Canal
    October 4, 2016
    The widened Suez Canal, located at Ismailia in Egypt, is now providing extra capacity for vessels, having been officially opened in August 2015. The waterway has great significance for world trade and has been widened at certain points and also expanded.