Skip to main content

Bermuda bridges being built

Bridges will be built in Bermuda, following the award of the design contract to a UK team comprising Ramboll, Knight Architects and Eadon Consulting. The deal was awarded by the Government of Bermuda and is for full design services for two replacement highway bridges. The two bridges form key links for Bermuda’s transport infrastructure, connecting L F Wade International Airport with capital city Hamilton to the west and St Georges to the east. Longbird Bridge was originally constructed in the 1950s as a
December 6, 2017 Read time: 2 mins
Bridges will be built in Bermuda, following the award of the design contract to a UK team comprising Ramboll, Knight Architects and Eadon Consulting. The deal was awarded by the Government of Bermuda and is for full design services for two replacement highway bridges.

The two bridges form key links for Bermuda’s transport infrastructure, connecting L F Wade International Airport with capital city Hamilton to the west and St Georges to the east. Longbird Bridge was originally constructed in the 1950s as a 60m-long twin carriageway steel swing bridge at the east end of the 1km-long causeway connecting the island with the airport. However the bridge closed to traffic 10 years ago and was temporarily bypassed with twin Bailey Bridge structures. Swing Bridge spans 120m across Ferry Reach, linking St George’s Harbour with the west of the island, and is a vital link for both vehicular and marine traffic. The 1960s swing bridge has received extensive upgrades, allowing it to remain open to vehicles but its mechanisms are worn and it no longer opens to shipping.

The design team will undertake studies to determine the most appropriate solutions for the new bridges, including fixed and movable structures. Robustness and durability are key factors as both existing bridges have suffered accelerated deterioration in the tropical climate, which is particularly aggressive to steel structures. In addition, the structures and their mechanisms must be designed to withstand the hurricane force winds which Bermuda periodically suffers.

Related Content

  • Turkish highways and bridge project financing secured
    June 7, 2018
    The financing package that will pay for Turkey’s €2.43 billion Malkara to Çanakkale highway and 1915 Çanakkale Bridge has now been secured. This follows on from Mott MacDonald completing its technical due diligence of the project documentation. The project will be handled under the PPP model. The centrepiece of the project is the €1.68 billion Çanakkale 1915 bridge. This will be over 4.6km long, with a 2,023m main span that will be the longest in the world for a suspension bridge. It will allow a clearance
  • Spencer wins Menai Suspension Bridge refurb
    September 16, 2022
    The UK contract, worth nearly €1.8 million, is to repaint the entire main span underdeck of the 417m-long bridge, the second oldest operational vehicular suspension bridge in the world.
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin
  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s