Skip to main content

Bermuda bridges being built

Bridges will be built in Bermuda, following the award of the design contract to a UK team comprising Ramboll, Knight Architects and Eadon Consulting. The deal was awarded by the Government of Bermuda and is for full design services for two replacement highway bridges. The two bridges form key links for Bermuda’s transport infrastructure, connecting L F Wade International Airport with capital city Hamilton to the west and St Georges to the east. Longbird Bridge was originally constructed in the 1950s as a
December 6, 2017 Read time: 2 mins
Bridges will be built in Bermuda, following the award of the design contract to a UK team comprising Ramboll, Knight Architects and Eadon Consulting. The deal was awarded by the Government of Bermuda and is for full design services for two replacement highway bridges.

The two bridges form key links for Bermuda’s transport infrastructure, connecting L F Wade International Airport with capital city Hamilton to the west and St Georges to the east. Longbird Bridge was originally constructed in the 1950s as a 60m-long twin carriageway steel swing bridge at the east end of the 1km-long causeway connecting the island with the airport. However the bridge closed to traffic 10 years ago and was temporarily bypassed with twin Bailey Bridge structures. Swing Bridge spans 120m across Ferry Reach, linking St George’s Harbour with the west of the island, and is a vital link for both vehicular and marine traffic. The 1960s swing bridge has received extensive upgrades, allowing it to remain open to vehicles but its mechanisms are worn and it no longer opens to shipping.

The design team will undertake studies to determine the most appropriate solutions for the new bridges, including fixed and movable structures. Robustness and durability are key factors as both existing bridges have suffered accelerated deterioration in the tropical climate, which is particularly aggressive to steel structures. In addition, the structures and their mechanisms must be designed to withstand the hurricane force winds which Bermuda periodically suffers.

Related Content

  • New bridge planned for Kenya’s port of Mombasa
    December 14, 2017
    Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor
  • Emovis continues with Mersey Gateway tolling
    March 18, 2022
    Emovis provides collection of tolls and charges for both Mersey Gateway Crossing and the older 87m-long Silver Jubilee Bridge through its merseyflow brand name.