Skip to main content

Belgrade to get a tunnel between Savska and Dunavska

A tunnel is to be built between the Belgrade city areas of Savska and Dunavska Padina at a cost between €100-130 million, according to the mayor. Project design was done Ces Cowi which was awarded a tender worth nearly €198,000 by the Directorate for Construction Land. The 9.6m-wide tunnel will be nearly 2km long and lay around 38m below ground. Work, however, is not expected to start until the end of 2018 and take around 30 months. Meanwhile, work on the 470m Zezeljev Bridge across the Danube River in Novi
May 26, 2017 Read time: 2 mins
A tunnel is to be built between the Belgrade city areas of Savska and Dunavska Padina at a cost between €100-130 million, according to the mayor.


Project design was done Ces Cowi which was awarded a tender worth nearly €198,000 by the Directorate for Construction Land.

The 9.6m-wide tunnel will be nearly 2km long and lay around 38m below ground.

Work, however, is not expected to start until the end of 2018 and take around 30 months.

Meanwhile, work on the 470m Zezeljev Bridge across the Danube River in Novi Sad and access roads is set to start. The bridge, to carry both road and rail lines replaces a similar structure that was destroyed by NATO bombing in 1999. Construction of the new bridge forms part of an EU strategy for the Danube Region.

The replacement project was delayed initially by subsurface wreckage from the old structure, which had to be removed.

Related Content

  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Hochtief buys out Bilfinger to take control of Herren Tunnel Lubeck
    March 14, 2016
    Global infrastructure group Hochtief has acquired the 50% of shares in Germany’s Herren Tunnel Lübeck toll road from industrial services provider Bilfinger. The acquisition brings Hochtief’s ownership to 100% and full operational control of the 30-year public-private partnership between Hochtief Solutions and Bilfinger Berger Project Investments. A contract with the project company Herrentunnel Lubeck, 50-50 joint venture, was signed in March 1999 and construction started in October 2001.Herrentunnel
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Landmark bridge for Italy?
    August 9, 2023
    The news that the Italian Government is once again considering building a bridge spanning the Messina Strait is of major significance for the construction sector, as well as for the country.