Skip to main content

Bay Bridge demolition underway in California

Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.
June 26, 2014 Read time: 1 min
Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.

Related Content

  • VIDEO: Saskatoon’s Traffic Bridge demolished to make way for new bridge
    January 11, 2016
    A 100-year-old Parker truss bridge in western Canada had no official name until its 90th birthday, in 2007. Now, The Traffic Bridge – across the South Saskatchewan River in the city of Saskatoon - is no more, after its demolition earlier this month.

    The Traffic Bridge, nearly 6m wide and 290m long and took a year to build, and was Saskatoon’s first bridge across the river when it opened in 1907. The bridge was built by Winnipeg city-based John D. Gunn and Sons.
  • Romanian bridge project well underway
    June 8, 2022
    Romania’s Braila Bridge project is well underway.
  • Special formwork for Moscow
    June 15, 2012
    Unusual staircase columns for pedestrian crossings outside Moscow required custom-made forms Every day the largest city in the largest country in the world is threatened with gridlock. The infrastructure of the present-day traffic system can no longer cope with the increased number of vehicles, and the urban administration of Moscow, Russia, resolved to upgrade the traffic arteries connecting the inner city to satellite towns. Greater Moscow (Oblast) has a population of over seven million, and to date
  • Highway project in Texas required demolition equipment
    May 1, 2018
    A contractor in Texas has used equipment from Brokk to help out with a tricky highway project. Upgrading work has been carried out on a 6.4km-long stretch of I-35 in San Antonio between Loop 410 NE and Loop 410 S. This stretch of the route was carrying around 185,000 vehicles/day and was suffering increasing levels of congestion at peak periods. Travel times lengthened by 65% during rush hour, while ramps on opposite sides of the interstate caused additional congestion and safety issues. In one section, t