Skip to main content

Bay Bridge demolition underway in California

Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.
June 26, 2014 Read time: 1 min
Demolition of the Bay Bridge in California is underway at present. A new cable stayed structure now carries traffic and the old steel cantilever bridge is being dismantled piece by piece. The work is being carried out in stages so as to maximise safety and also to meet the tough environmental legislation that forbids any waste material accidentally falling into the waterway. The dismantling process is taking three years in all to complete.

Related Content

  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • Bridge down
    May 24, 2013
    Thieves in Turkey recently stole a bridge, which is then thought to have been cut up for scrap. The 25m long bridge weighed 22tonnes and was located close to a small village in Turkey’s western province of Kocaeli. When villagers realised the bridge had disappeared they called police who quickly ascertained that the structure had been cut to piece and hauled away for scrap. This follows a similar incident in India when a steel bridge was stolen by enterprising thieves, who convinced locals with forged docum