Skip to main content

Bangladesh tunnel project to use Chinese TBM

A Chinese firm has won the contract to supply the tunnel boring machine (TBM) for a major road tunnelling project in Bangladesh. The Chinese manufacturer, Tianhe Mechanical Equipment Manufacturing (Tianhe Mechanical), is building the TBM to the specific design requirements of the client. This piece of equipment is the largest TBM built so far in China and tips the scales at 2,200tonnes, while it features a cutter diameter of 12.12m. The TBM will be used to drive a 3.5km-long road tunnel running under the K
March 28, 2018 Read time: 1 min

A Chinese firm has won the contract to supply the tunnel boring machine (TBM) for a major road tunnelling project in Bangladesh. The Chinese manufacturer, Tianhe Mechanical Equipment Manufacturing (Tianhe Mechanical), is building the TBM to the specific design requirements of the client. This piece of equipment is the largest TBM built so far in China and tips the scales at 2,200tonnes, while it features a  cutter diameter of 12.12m. The TBM will be used to drive a 3.5km-long road tunnel running under the Karnaphuli River.

Related Content

  • Weigh-in-motion for Bangabandhu Bridge
    July 8, 2022
    The bridge, in Bangladesh, will also have automatic number plate recognition cameras to identify overweight vehicles.
  • Competitive asphalt compaction market
    February 13, 2012
    Existing tough competition will step up another gear with the launch of further new machines in the asphalt roller market, Mike Woof reports. The asphalt compaction equipment market is intensely competitive, with a number of major firms all fighting to boost market share. And with many major manufacturers having revamped ranges during 2010 and further new models now due, this rivalry is set to become tougher still.
  • Drilling rig meets the utility supply challenge
    April 11, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.
  • Drilling rig meets the utility supply challenge
    May 9, 2012
    A tricky utility supply project has been carried out in difficult conditions in Germany, without disturbing a village access road. The drilling work for the project was operated by boring contractor Beermann and the site was located on a plateau some 5km from the nearest village.