Skip to main content

Bangladesh investing heavily in roads

In Bangladesh, the draft detailed design of the US$5.14 billion Dhaka-Chittagong highway has been approved by the government. The feasibility study to execute the plan has already been completed. The highway will measure 198km in length. The project is to be implemented under a public-private partnership (PPP) basis.
October 23, 2015 Read time: 1 min
In Bangladesh, the draft detailed design of the US$5.14 billion Dhaka-Chittagong highway has been approved by the government. The feasibility study to execute the plan has already been completed. The highway will measure 198km in length. The project is to be implemented under a public-private partnership (PPP) basis.

Related Content

  • Italian highway deals moving ahead
    January 21, 2022
    Important Italian highway deals are moving ahead.
  • Indonesian toll roads
    August 13, 2012
    ijaya Karya (Wika), the Indonesian governmentowned construction service provider, will build toll roads linking Kedung Badak to Kedung Halang and Pandaan to Gempol in Bogor through two contracts worth US$36.35 million and $24 million, respectively. Awarded by highways operator Jasa Marga (JSMR), the contracts require the roads completion in 18 months. The operator of the Tangerang- Merak Toll Road, Marga Mandala Sakti (Marga Mandala), will be allocating U$17 million to increase the toll road’s capacity. It
  • Metro Pacific Tollways starts work on Cebu-Cordova Link bridge
    July 10, 2018
    Metro Pacific Tollways has started construction of a toll bridge to connect Mactan island to mainland Cebu.
  • Indonesia bridge project plans revived
    August 9, 2017
    In Indonesia plans are being drawn up for a bridge to connect Bintan Isand with Batam Island. In all the bridge connection would measure 7km long and be built in three sections: Batam - Pulau Tanjung Sauh; Pulau Tanjung Sauh - Pulau Buau; Pulau Buau – Bintan. The bridge project was proposed previously in 2005 but stalled a few years later, with financing being an issue at the time. When the work was costed back in 2009 it had a pricetag of US$350 million. However, the work will be somewhat more costly to co