Skip to main content

BAM, Morgan Sindall start UK’s €112 million Oldbury viaduct job

A joint venture of BAM, Morgan Sindall and VolkerFitzpatrick has started refurbishing the Oldbury viaduct on the UK’s M5 motorway. The €112 million project will see repairs to a 3.5km stretch between junctions 1 and 2 of the motorway – one of the UK’s busiest routes – to the west of Birmingham city. Work is being done in three phases starting with the removal of the road surface on the southbound carriageway to investigate the condition of the concrete deck.
July 31, 2017 Read time: 2 mins
M5 junctions 1 and 2 in need of repair and waterproofing

A joint venture of 7456 BAM, 2567 Morgan Sindall and 2849 VolkerFitzpatrick has started refurbishing the Oldbury viaduct on the UK’s M5 motorway.

The €112 million project will see repairs to a 3.5km stretch between junctions 1 and 2 of the motorway – one of the UK’s busiest routes – to the west of Birmingham city.

Work is being done in three phases starting with the removal of the road surface on the southbound carriageway to investigate the condition of the concrete deck.

Damaged concrete will be repaired and a new waterproofing layer added prior to resurfacing. The process will then be repeated on the northbound carriageway, said Matt Atkinson, project director for the joint venture.

Various sections of the M5 through the West Midlands are elevated – viaducts – that were made of concrete in the late 1960’s. The Oldbury viaduct carries 120,000 vehicles a day, according to 8100 Highways England, the government agency responsible for major roads in England.

“This scheme is the largest concrete repair project ever undertaken in the UK,” the agency said. “To carry out concrete repair and joint replacement works safely, we will need to scaffold under most of the 2.9km long, 30m wide viaduct. All of our scaffolding will then be encapsulated in polythene to prevent the escape of water, dust and debris.”

For more information on companies in this article

Related Content

  • Repairs to piers on Italian viaduct
    July 17, 2012
    Hydrodemolition played a vital role in the repairs and strengthening of the multi-span Rio Verde Viaduct, one of the tallest in Europe, that carries the busy dual two-lane A15/E33 Autostrada della Cisa over a steep-sided valley in the municipality of Pontremoli, north-west Italy. Conjet hydrodemolition equipment was used to remove damaged concrete from the faces of the viaduct's rectangular concrete piers, which rise up to 136m from the valley bottom to the steel deck. A new and thicker concrete skin was th
  • 3D GPR technology makes for speedy surveys
    August 21, 2019
    Traffic-speed surveys using 3D ground penetrating radar (GPR) are slashing the time required for surveying the UK’s motorways, and allowing a more thorough analysis of the pavement layers and condition.
  • Innovative, quality asphalt surfacing solutions
    February 22, 2012
    An array of innovative mix designs and special processes have been introduced to the paving market in recent years. These are now being used in many site applications and are offering contractors the benefits of fast application and high surface quality while providing safe, cost-effective and hard wearing solutions with long life for clients.
  • VIDEO: Balfour starts M3 bridge upgrade in UK following demolition
    November 23, 2016
    Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.