Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • New Zealand: 10-year plan sets out road infrastructure spending
    December 19, 2014
    New Zealand will spend US$30 billion over the next decade on public transport, including road works not just in major urban areas but in the provinces. The announcement was made by Transport Minister Simon Bridges after the government approved the draft Government Policy Paper 2015. The approved document takes into consideration concerns by local government that their transport infrastructure needs would be ignored in favour of those for large urban areas, the New Zealand Herald newspaper reported.
  • Bridge savings in Scotland to fund road improvements
    August 27, 2014
    The project to construct the new Forth Crossing close to Scottish capital Edinburgh is looking extremely positive, with cost savings envisaged for the bridge. The Queensferry Crossing scheme now looks to require slightly less funding than had been originally expected when the plans were unveiled in 2011, due in part to tight controls over spending. The bridge costs had been budgeted at close to €2 billion (£1.6 billion) initially but the project now looks likely to cost €1.81 billion (£1.45 billion). The sa
  • Texas highway deal for joint venture
    August 12, 2021
    An important Texas highway project is being carried out by a joint venture.