Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • CINTASA is offering an array of advanced conveyor systems
    March 14, 2013
    Spanish specialist CINTASA is aiming its new conveyor technologies at markets including quarrying and the cement sector. The firm’s latest tripper discharger and novel TEB vertical conveyor are said to offer proven and durable solutions for heavy duty applications.
  • Deadline for submitting European Transport Conference 2014 abstracts
    February 3, 2014
    Tomorrow is the deadline for submitting abstracts to the European Transport Conference (ETC) 2014. The ETC connects the worlds of research, consultancy, policy and practice. Attendance at ETC allows different groups to pose questions to fellow professionals and to assess what is possible in terms of delivery. Researchers are challenged by policy-makers; practitioners need to deliver on the ground what the policy-makers want. The Association for European Transport has identified for the 2014 Conference so
  • Improved access technology from Ruthmann
    January 6, 2017
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Improved access technology from Ruthmann
    January 31, 2013
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T