Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    January 6, 2017
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Waitzinger concrete pumps shown in Liebherr colours for the first time
    February 7, 2013
    Bauma 2013 will see the former Waitzinger concrete pump range in Liebherr livery for the first time, following the purchase of the company in October 2012. Liebherr will show four pumps, including the compact 41 M5XXT and the high capacity THP 160H/36 R4XXH. This truck-mounted pump has a four-section 36m boom yet sits on the narrow XXH outrigger supports and is capable of handling up to 160m3/h of concrete delivery.
  • Wassara offers water drilling option
    January 6, 2017
    Innovative water-powered drilling technology developed in Sweden is claimed to drill straighter and deeper than conventional systems. Said to be environmentally friendly, the Wassara drilling technology has been developed and perfected over 20 years by Swedish iron ore producer LKAB. Using the Wassara drills has allowed LKAB to drastically cut operating costs. A complete range is now offered and suits applications within ground engineering, dam rehabilitation and exploration drilling. The heart in the syste
  • Wassara offers water drilling option
    January 28, 2013
    Innovative water-powered drilling technology developed in Sweden is claimed to drill straighter and deeper than conventional systems. Said to be environmentally friendly, the Wassara drilling technology has been developed and perfected over 20 years by Swedish iron ore producer LKAB. Using the Wassara drills has allowed LKAB to drastically cut operating costs. A complete range is now offered and suits applications within ground engineering, dam rehabilitation and exploration drilling. The heart in the syste