Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • ‘Super mobile’ mixing plant from Ammann
    April 18, 2013
    Ammann has released the Easy Batch 140 asphalt mixing plant at bauma 2013. The Easy Batch 140 is designed specifically for top mobility and a high output of 140tonnes per hour. The completely autonomous asphalt mixing plant produces quality asphalt and is specifically designed to provide product to larger construction sites with the flexibility of fast recipe changes. It comes pre-assembled on two trailers and can be set up without a crane.
  • ‘Super mobile’ mixing plant from Ammann
    April 18, 2013
    Ammann has released the Easy Batch 140 asphalt mixing plant at bauma 2013. The Easy Batch 140 is designed specifically for top mobility and a high output of 140tonnes per hour. The completely autonomous asphalt mixing plant produces quality asphalt and is specifically designed to provide product to larger construction sites with the flexibility of fast recipe changes. It comes pre-assembled on two trailers and can be set up without a crane.
  • ‘Super mobile’ mixing plant from Ammann
    January 6, 2017
    Ammann has released the Easy Batch 140 asphalt mixing plant at bauma 2013. The Easy Batch 140 is designed specifically for top mobility and a high output of 140tonnes per hour. The completely autonomous asphalt mixing plant produces quality asphalt and is specifically designed to provide product to larger construction sites with the flexibility of fast recipe changes. It comes pre-assembled on two trailers and can be set up without a crane.
  • Terex sales wish for Genie
    January 6, 2017
    The recently launched CE-compliant Genie GS 4047 compact electric scissor lift has a 14metre working height.