Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • World Bank finances Uzbekistan road development
    July 7, 2015
    The World Bank will grant Uzbekistan a US$200 million loan for 25 years, including a grace period of five years. The funds will go towards the $240 million Regional Roads Development project that is scheduled to be completed by 2021, according to UzDaily.uz. Uzbekistan’s government also reported that around 117km roads were built in the first half of this year.
  • Wirtgen launches cold recycler and soil stabiliser at INTERMAT
    January 6, 2017
    Wirtgen’s new generation of its cold recycler and soil stabiliser, the WR 240i, features a cab that can be offset beyond the side of the machine, giving a clear view of the milled edge.
  • Wirtgen launches cold recycler and soil stabiliser at INTERMAT
    February 7, 2012
    Wirtgen’s new generation of its cold recycler and soil stabiliser, the WR 240i, features a cab that can be offset beyond the side of the machine, giving a clear view of the milled edge.
  • High performance excavators from LiuGong
    January 6, 2017
    LiuGong is following up its introduction of its first E series excavator, the 922E, with a whole new range. The top-of-the-line model is the its 945E, which competes in the 45tonne class, features a 2.2m3 bucket and is powered by a Cummins diesel delivering 298kW. Also due are the 30tonne class 930E and 25tonne class 925E, which share similar features. The E-Series excavators are offered with the LiuGong Intelligent Power Control System (IPC), which provides more accurate matching and control over engine sp