Skip to main content

Balfour works nights on Scotland’s Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.
July 31, 2017 Read time: 2 mins
Up and in place for steel support beams on the Perth Transport Futures project

The Perth Transport Futures project has reached a milestone with the placing of steel beams to support the road bridge on Scotland’s A9 dual carriageway.

International construction group 1146 Balfour Beatty recently completed the work over three consecutive nights to position the three 103tonne beams.

Balfour Beatty is undertaking the work on behalf of Perth and Kinross Council under the Scape National Civil Engineering and Infrastructure Framework.

On completion, the project will see the creation of a new junction on the A9 dual carriageway, as well as a new link road. This will enable access to development land to the west of the city and support growth in Scotland’s third busiest region.

Hector Macaulay, Balfour Beatty’s Scotland regional managing director, said the company has engaged more than 50 local suppliers and subcontractors. Balfour Beatty sourced all of its steel from British manufacturers, with over half originating in Scotland.

<%$Linker:

2

 

External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Perth Transport Futures Project false http://www.perthtransportfutures.co.uk/ false false%> has four phases and include development of the Cross Tay Link Road around Perth. Phase 1 has been developed by the council's roads infrastructure team and designed by consultants CH2M. It includes a grade-separated interchange between the A9 and the A85 roads as well as a bridge over the River Almond.

 

For more information on companies in this article

Related Content

  • Cummins meeting Stage IV/Tier 4 Final with extended range of engines
    January 6, 2017
    The Cummins Engine stand this year’s Bauma will be dominated by one of the largest engines at the show, alongside one of the smallest. The firm will show a 37kW (49hp) 2.8-litre QSF2.8 alongside its giant QSK95, which delivers 3,130kW (4,200hp). These two engine highlight extensions to both ends of the Cummins offering, one of the broadest in the industry that is capable of meeting the coming Stage IV/Tier 4 Final emissions legislation.
  • Cummins meeting Stage IV/Tier 4 Final with extended range of engines
    February 7, 2013
    The Cummins Engine stand this year’s Bauma will be dominated by one of the largest engines at the show, alongside one of the smallest. The firm will show a 37kW (49hp) 2.8-litre QSF2.8 alongside its giant QSK95, which delivers 3,130kW (4,200hp). These two engine highlight extensions to both ends of the Cummins offering, one of the broadest in the industry that is capable of meeting the coming Stage IV/Tier 4 Final emissions legislation.
  • DAT’s speedy and reliable dataloggers
    January 6, 2017
    DAT instruments is a leading manufacturer of dataloggers for geotechnical activities and special foundations. The company, whose dataloggers are suitable for use in applications relating to jet grouting; grouting; cement injection; drilling; MWD; CFA; soil mixing; vibroflotation; diaphragm walls; Lugeon tests; and mineral investigation. Product reliability and company service are said to be among DAT instruments key priorities.
  • DAT’s speedy and reliable dataloggers
    March 27, 2013
    DAT instruments is a leading manufacturer of dataloggers for geotechnical activities and special foundations. The company, whose dataloggers are suitable for use in applications relating to jet grouting; grouting; cement injection; drilling; MWD; CFA; soil mixing; vibroflotation; diaphragm walls; Lugeon tests; and mineral investigation. Product reliability and company service are said to be among DAT instruments key priorities.