Skip to main content

Balfour Beatty wins Scottish transport contract

Balfour Beatty has won a £35 million deal by Perth and Kinross Council to deliver the first phase of the Perth Transport Futures Project. Under the terms of the deal, Balfour Beatty will construct a new grade separated junction on the A9 dual carriageway as well as a new link road enabling access to development land to the west of Perth. This is the first of four phases of the Perth Transport Futures project, which aims to reduce congestion, boost transportation in the area and develop the local economy.
August 26, 2016 Read time: 2 mins
1146 Balfour Beatty has won a £35 million deal by Perth and Kinross Council to deliver the first phase of the Perth Transport Futures Project. Under the terms of the deal, Balfour Beatty will construct a new grade separated junction on the A9 dual carriageway as well as a new link road enabling access to development land to the west of Perth. This is the first of four phases of the Perth Transport Futures project, which aims to reduce congestion, boost transportation in the area and develop the local economy.

The works are due to commence in September 2016, with completion expected in the second quarter of 2019.

The contract has been awarded under the Scape Group’s National Civil Engineering and Infrastructure Framework. The aim of this plan is to support growth in Scotland’s third fastest developing region. Balfour Beatty has previously worked on highway infrastructure schemes in the area including the A9, A90 and the M90.

For more information on companies in this article

Related Content

  • New structure for A46 bypass
    January 10, 2025
    A new concrete structure is being built for the UK’s A46 bypass.
  • Davao City tunnel work accelerated
    November 18, 2022
    The twin-tube 2.3km-long tunnel will be the longest in the Philippines and is being constructed by Filipino and Japanese engineers.
  • Eurovia success in Hertfordshire, England contracts bid
    October 11, 2012
    Eurovia Infrastructure is the only contractor to secure a position on all three Lots of the US $ 144.02 million (£90mn) Hertfordshire Highways Structural Maintenance and Surface Treatments Framework contracts. The contracts began on 1 October 2012 and will run for four years. Lot 1 of the Hertfordshire County Council contract covers carriageway and footway surface treatments; Lot 2 covers carriageway resurfacing; and Lot 3 covers general civil engineering.
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete